atlas-connect-l AT lists.bnl.gov
Subject: Atlas-connect-l mailing list
List archive
[Atlas-connect-l] REMINDER: ATLAS Connect Weekly meeting
- From: David Champion <dgc AT uchicago.edu>
- To: atlas-connect-l <atlas-connect-l AT lists.bnl.gov>
- Subject: [Atlas-connect-l] REMINDER: ATLAS Connect Weekly meeting
- Date: Mon, 24 Mar 2014 10:34:08 -0500
Hello all -
Rob is unavailable today but we will hold an informal call for updates
on a few points:
1. TACC/Stampede job execution
2. BNL worker node access
3. Parrot report (if applicable - Suchandra?)
And any other items, ad hoc.
Connection information: https://indico.cern.ch/event/302365/
* On 17 Feb 2014, Rob Gardner wrote:
> Just a reminder about today’s ATLAS Connect meeting, coordinates below.
>
> On Feb 14, 2014, at 12:15 PM, Rob Gardner <rwg AT hep.uchicago.edu> wrote:
>
> > The ATLAS Connect meeting time has been determined:
> >
> > Mondays, 11:30 Central
> >
> > Connection information is available here:
> > https://indico.cern.ch/event/302365/
> >
> > Xin will represent the Tier 1. I’m adding Wei and Saul for possible
> > flocking targets at WT2 and NET2, respectively, at some point.
> >
> > The agenda will be informal, and we’ll discuss the topics below.
> >
> > Cheers,
> > - Rob
> >
> >
> > On Feb 12, 2014, at 2:48 PM, Rob Gardner <rwg AT hep.uchicago.edu> wrote:
> >
> >> I’ve completely dropped the ball on sending around a doodle poll to
> >> establish a regular meeting time slot for ATLAS Connect issues.
> >>
> >> Here is a poll,
> >>
> >> http://doodle.com/9srfhbzbbrxev7zc
> >>
> >> Please fill out the poll before the end of the week. Once we have a
> >> time chosen, I’ll setup a meeting in Indico and we’ll likely use Vidyo.
> >> (there is a phone bridge)
> >>
> >> Some topics and possible projects to discuss, both for ATLAS Connect
> >> User, and ATLAS Connect Cluster:
> >>
> >> - New targets: Stampede, Midway and SWT2
> >> - Newly Flocked Tier3: UT
> >> - Faxbox permissions and usability: with Condor, xrootd, and globus
> >> online
> >> - Parrot wrapper
> >> - Parrot overhead for ROOT IO (as compared to WAN overhead)
> >> - Building useful examples for the documentation
> >> - Adding a PROOF cluster service (UChicago-Exotics group request)
> >> - Additional software tools on login.usatlas.org
> >> - ATLAS Connect job wrapper to grab additional accounting info
> >> (institution an working group)
> >> - Writing down a Faxbox usage policy; work needed for lazy enforcement
> >> - CONNECT Panda:
> >> > New Panda queue
> >> > Autopyfactory
> >> > Production targets: Stampede, Midway
> >> - ATLAS Connect at next US ATLAS Facilities meeting, at SLAC, April 7
> >> > Documented ATLAS Connect analysis templates
> >> > Flocked Tier3 operations: stability, relative performance
> >> > Use of FAX from ATLAS Connect
> >> > User tutorial
> >>
> >> I sometimes probe the system with a test job set. Below is what I got
> >> running today (jobs now deleted).
> >> See below. (Over the weekend, Dave, Ilija and I were ramping up jobs to
> >> for FAX stress testing
> >> and, with priorities favorably set, could reach up to 5k jobs).
> >>
> >> Cheers,
> >> - Rob
> >>
> >>
> >>
> >>
> >> <screenshot_1199.png>
> >>
> >>
> >> <screenshot_1198.png>
> >>
> >>
> >> Last weekend:
> >>
> >> <screenshot_1176.png>
> >>
> >>
> >> ---
> >> Rob Gardner • Twitter: @rwg • Skype: rwg773 • g+: rob.rwg • +1
> >> 312-804-0859 • University of Chicago
> >>
> >
> > ---
> > Rob Gardner • Twitter: @rwg • Skype: rwg773 • g+: rob.rwg • +1
> > 312-804-0859 • University of Chicago
> >
> > _______________________________________________
> > Atlas-connect-l mailing list
> > Atlas-connect-l AT lists.bnl.gov
> > https://lists.bnl.gov/mailman/listinfo/atlas-connect-l
>
> ---
> Rob Gardner • Twitter: @rwg • Skype: rwg773 • g+: rob.rwg • +1 312-804-0859
> • University of Chicago
>
> _______________________________________________
> Atlas-connect-l mailing list
> Atlas-connect-l AT lists.bnl.gov
> https://lists.bnl.gov/mailman/listinfo/atlas-connect-l
--
David Champion • dgc AT uchicago.edu • University of Chicago
Enrico Fermi Institute • Computation Institute • USATLAS Midwest Tier 2
OSG Connect • CI Connect
-
[Atlas-connect-l] REMINDER: ATLAS Connect Weekly meeting,
David Champion, 03/24/2014
- Re: [Atlas-connect-l] REMINDER: ATLAS Connect Weekly meeting, David Champion, 03/31/2014
Archive powered by MHonArc 2.6.24.