Thanks Jay for the notice. The system should tolerate the interruption okay.
Best,
- Rob
On May 14, 2016, at 3:30 PM, Jay Fowler <fowler AT csufresno.edu> wrote:_______________________________________________Hi All,A UPS in our datacenter failed following a power outage Thursday evening (yes our UPS was interrupted). Our cluster was down for about 1 1/2 hours. The systems restarted around 20:30 PDT (-07:00) however the systems were not fully accessible until Friday evening. In an effort to mitigate further outages with the UPS, the electricians have bypassed it until it can be serviced next week.Apologies for the late notice. Please let me know if I can provide any additional information.Jay
Atlas-connect-l mailing list
Atlas-connect-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/atlas-connect-l
-
[Atlas-connect-l] Fresno T3 Outage 5/12,
Jay Fowler, 05/14/2016
- Re: [Atlas-connect-l] Fresno T3 Outage 5/12, Rob Gardner, 05/15/2016
Archive powered by MHonArc 2.6.24.