Dear All,
Below please find the minutes from our eRHIC IR Design meeting that was held on Friday, 6/8/2018. Please note that our next meeting will be on Friday June 22, at 3 pm.
Greetings,
Bill
Minutes from the eRHIC IR Design meeting held on 6/8/18
---------------------------------------------------------------------------------
* We started with a brief discussion of the agenda for the meeting.
* Walk through the Slides that Bob P. had sent to the list prior to the mtg: File- 1806-postpre-v3.pdf
- Slide #1
- Some changes in going from a crossing angle of 22 to 25 mr. Shorter Quad. length, etc.
- Shows that X/Y chromaticity gets reduced.
- Also frees up some space for the warm to cold transition.
- Slide #2
- Shows beam envelope on the downstream side.
- Slide #3
- Show the rear side Beta function.
- Slide #4
- Shows the rear side proton aperture
- Slide #5
- Electron rear side Beta ftn
- Slide #6
- Electron rear side aperture
- Slide #7
- Table of Magnet parameters
- Slide #8
- Summary comments
- Slides 9, 10, 11, 12, 13
- Option "B"
- Largest Beta, Chrom X goes, down, Chrom Y goes up.
- Elke points out that Alexei needs info to simulate the expected impedance.
- Bob will send Elke info. for a few missing magnets.
- Elke acknowledged getting a paragraph of text from Bob.
- She needs new Figures from Bob.
- Elke needs the High Acceptance Optics from Guillaume for the old (pCDR) setup. "Normal files".
- Elke also needs a simple function for the Crab cavities.
- Vadim will provide a i-dimensional function for the C.C. to Elke, which describes the effect of the C.C. on the beam.
* We walk through Brett's Slides, sent to the list prior to the mtg. File - RearQuadFirstPass25mrad_08jun2018v2.pptx
- Slide #1
- rear side of the Q1APR and Q1ER magnets
- With B-field correlation between the magnets. The cross talk decreases to about 0.
- Slide #2
- Shows the field in the coil of about 3T. Regular direct wind is OK.
- Slide #4
- Would be simpler if last Quad on incoming proton beam is split into two magnets.
- Conclusion: The increased crossing angle (going from 22 to 25 mr) has made the magnet designs easier, as expected.
- Need to see if it fits in the existing tunnel!
* We next walk through Alexander's Slides, sent to the list prior to the mtg. File - ayk-2018-06-08-bnl-ir-meeting.pptx
- Slide #2
- Overall status
- Slide #3
- Front side layout
- Slide #4
- Front side layout
- Slide #5
- Acceptances
- General discussion about the simulations
* Next Meeting
- Friday June 22nd, starting at 3 pm
- Draft Agenda:
- Alexei on an impedance update
- Doug on how the IR design fits in the tunnel
- Simulation update from Alexander
- Bob's setup for the forward side.
End of meeting.
Attachment:
1806-postpre-v3.pdf
Description: Adobe PDF document
Attachment:
RearQuadFirstPass25mrad_08jun2018v2.pptx
Description: application/vnd.openxmlformats-officedocument.presentationml.presentation
Attachment:
ayk-2018-06-08-bnl-ir-meeting.pptx
Description: application/vnd.openxmlformats-officedocument.presentationml.presentation
- [E-rhic-ir-l] Minutes from the eRHIC IR Design meeting held on June 8, 2018., Bill Christie, 06/19/2018
Archive powered by MHonArc 2.6.24.