e-rhic-ir-l AT lists.bnl.gov
Subject: E-rhic-ir-l mailing list
List archive
- From: Zhengqiao Zhang <qiao AT rcf.rhic.bnl.gov>
- To: e-rhic-ir-l AT lists.bnl.gov
- Subject: Re: [E-rhic-ir-l] BNL EIC IR Design Meeting
- Date: Fri, 15 Nov 2019 11:26:06 -0500
Hi all,
I would like to give an update on the electron polarimeter. Please find my slides in the attachment.
Thanks,
Zhengqiao
Attachment:
20191115_IR_Zhengqiao.pdf
Description: Adobe PDF document
On Nov 13, 2019, at 2:33 PM, Hoffman, Caitlin via E-rhic-ir-l <e-rhic-ir-l AT lists.bnl.gov> wrote:<Mail Attachment.ics>_______________________________________________BNL EIC IR Design Bi-Weekly Meeting
FROM: H. Witte / W. ChristieWHERE: Bldg 911B- LARGE Conference RoomWHEN: Friday, Nov. 15TIME: 2:30pmAgenda as follows:
- Plan moving forward—Holger
- New electron rear design—Steve T.
- Simulation update—“The Friends from Physics”
- Status of Blue Ring integration—Henry
- Beam pipe concept (design)—Sasha
- All other business
Connect Via BlueJeans:Meeting URLMeeting ID210 371 270Want to dial in from a phone?Dial one of the following numbers:+1.408.740.7256 (US (San Jose))+1.408.317.9253 (US (Primary, San Jose))(see all numbers - http://bluejeans.com/premium-numbers)Enter the meeting ID and passcode followed by #Connecting from a room system?Dial: bjn.vc or 199.48.152.152 and enter your meeting ID & passcode Please upload your slides onto the SharePoint Site: https://brookhavenlab.sharepoint.com/sites/eRHIC/IR/SitePages/Home.aspx(All Minutes and previous slides will be available for viewing on this site)
E-rhic-ir-l mailing list
E-rhic-ir-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/e-rhic-ir-l
-
[E-rhic-ir-l] BNL EIC IR Design Meeting,
Hoffman, Caitlin, 11/13/2019
- Re: [E-rhic-ir-l] BNL EIC IR Design Meeting, Zhengqiao Zhang, 11/15/2019
- Re: [E-rhic-ir-l] BNL EIC IR Design Meeting, Jaroslav Adam, 11/15/2019
- Re: [E-rhic-ir-l] BNL EIC IR Design Meeting, Novokhatski, Alexander, 11/15/2019
-
Re: [E-rhic-ir-l] BNL EIC IR Design Meeting,
Novokhatski, Alexander, 11/15/2019
- Re: [E-rhic-ir-l] BNL EIC IR Design Meeting, Aschenauer Elke-Caroline, 11/15/2019
- <Possible follow-up(s)>
-
Re: [E-rhic-ir-l] BNL EIC IR Design Meeting,
Lovelace III, Henry, 11/14/2019
- Re: [E-rhic-ir-l] BNL EIC IR Design Meeting, Aschenauer Elke-Caroline, 11/14/2019
- [E-rhic-ir-l] BNL EIC IR Design Meeting, Hoffman, Caitlin, 11/19/2019
Archive powered by MHonArc 2.6.24.