Skip to Content.
Sympa Menu

e-rhic-ir-l - [E-rhic-ir-l] CDR

e-rhic-ir-l AT lists.bnl.gov

Subject: E-rhic-ir-l mailing list

List archive

Chronological Thread  
  • From: Aschenauer Elke-Caroline <elke AT bnl.gov>
  • To: e-rhic-ir-l AT lists.bnl.gov, "Wu, Qiong" <qiowu AT bnl.gov>, "Blednykh, Alexei" <blednykh AT bnl.gov>, "Hetzel, Charles" <chetzel AT bnl.gov>, Holger Witte <witte.holger AT gmail.com>, Adam Jaroslav <jadam AT bnl.gov>, Jentsch Alex <ajentsch AT bnl.gov>, "Montag, Christoph" <montagc AT bnl.gov>, marcy AT jlab.org
  • Subject: [E-rhic-ir-l] CDR
  • Date: Tue, 21 Jul 2020 12:20:53 -0400

Dear All,

as we discussed last meeting the deadline for the CDR is approaching fast.
I made a overleaf for chapter 3.2 alone so all of you can modify things if you like directly there, I also attach a tarfile with all the files needed.

everything compiles standalone if you keep the structure and latex EIC_CDR.tex
I mark the main responsible for a subsection in red

If you have any concerns or questions please contact me.
Please keep in mind the final final version of the CDR is due end of November 2020, this version is for the status review in September 9/10th to show we are ready for a cd-1 review.

Cheers elke

3 EICDesign 1

3.1 InteractionRegionDesign ............................. 1

  1. 3.1.1  InteractionRegionDesignConcept.................... 1         Holger, Elke

  2. 3.1.2  IRVacuumDesign ............................. 9                        Charlie

    Geometry .................................. 10 

    MaterialConsiderations.......................... 11 

    ImpedanceandInstabilities........................ 13 

    VacuumRequirements........................... 14

  3. 3.1.3  Interaction Region Performance for Scientific Requirements . . . . . 15         Friends from Physics

    Realization of the Scientific Requirements for the Central Detector . 16

    Realization of the Scientific Requirements for the Interaction Region

  4. 3.1.4  CrabCavityRequirementandSpecifications . . . . . . . . . . . . . . 24       Qiong

    EICCrabCavityIntroduction....................... 24 

    EIC Crab Cavity Requirement and Specifications . . . . . . . . . . . . 25 

  5. 3.1.5  ImpedanceModeling............................ 27                          Alexei

    IRChamber…………………………… 27

    LongitudinalImpedanceModel ..................... 30

  6. 3.1.6  Betatron Tune Dependence on Electron Beam Intensity . . . . . . . . 33        Christoph

  7. 3.1.7  SynchrotronRadiationAnalysis ..................... 35        Charlie and Marcy

Attachment: chapter3.2.tar.gz
Description: GNU Zip compressed data


 ( `,_' )+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-
  )    `\                                                      +
 /    '. |        Elke-Caroline Aschenauer  (she/her/hers)      =
 |       `,                                                      -
  \,_  `-/        Brookhaven National Lab                         +
  ,&&&&&V         Physics Dept.,            25 Corona Road         =
 ,&&&&&&&&:       Bldg. 510 /2-195          Rocky Point, NY,        -
,&&&&&&&&&&;      20 Pennsylvania Avenue                 11778       +
|  |&&&&&&&;\     Upton, NY 11973                                     =
|  |       :_) _  Tel.:  001-631-344-4769   Tel.:   +1-631-569-4290    -
|  |       ;--' |                           Cell-USA:  +1-757-2565224   +
'--'   `-.--.   |                           Cell-Europe: +49152220025211 =
   \_    |  |—‘                                                           -
     `-._\__/     Mail: elke AT bnl.gov        elke.caroline AT me.com           +
            +=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=












Archive powered by MHonArc 2.6.24.

Top of Page