Skip to Content.
Sympa Menu

ecce-eic-public-l - [Ecce-eic-public-l] ECCE 3rd Simulation Campaign

ecce-eic-public-l AT lists.bnl.gov

Subject: ECCE Public Announcements

List archive

Chronological Thread  
  • From: "Dean, Cameron" <cdean AT bnl.gov>
  • To: Xinbai Li via Ecce-eic-phys-l <ecce-eic-phys-l AT lists.bnl.gov>, "xinbai via Ecce-eic-public-l" <ecce-eic-public-l AT lists.bnl.gov>, "Dean, Cameron via Ecce-eic-det-l" <ecce-eic-det-l AT lists.bnl.gov>, Ecce-eic-comp-l <ecce-eic-comp-l-bounces AT lists.bnl.gov>
  • Subject: [Ecce-eic-public-l] ECCE 3rd Simulation Campaign
  • Date: Mon, 15 Nov 2021 18:47:33 +0000

Dear ECCE enthusiasts,

 

We are happy to announce that the third simulation campaign is nearing completion, with the last few jobs running on our batch systems. Details on the third campaign and the location of the data samples can be found on our twiki page at https://wiki.bnl.gov/eicug/index.php/ECCE_Simulations_Working_Group#Campaign_3

 

The third campaign reflects the final detector setup for the proposal, based off the costing discussions. The data format and output evaluators are identical to what was generated for the second campaign. We would like to emphasize that most physics studied can be completed with the second campaign, and the third campaign is aimed for limited set of studies that require the final detector setup.

 

We would like to take this opportunity to thank everyone that has contributed to this design. We are nearing the end of the proposal timeline  and we hope this final production reflects the hard work that everyone has put in.

 

Many thanks,

Cameron, for the simulation, production and computing teams.



  • [Ecce-eic-public-l] ECCE 3rd Simulation Campaign, Dean, Cameron, 11/15/2021

Archive powered by MHonArc 2.6.24.

Top of Page