Skip to Content.
Sympa Menu

eic-projdet-pfrich-mechanical-design-l - [Eic-projdet-pfrich-mechanical-design-l] Latest Prototype STEP

eic-projdet-pfrich-mechanical-design-l AT lists.bnl.gov

Subject: ePIC pfRICH mechanical design mailing list

List archive

Chronological Thread  
  • From: Alex Eslinger <eslinger AT jlab.org>
  • To: "eic-projdet-pfrich-mechanical-design-l AT lists.bnl.gov" <eic-projdet-pfrich-mechanical-design-l AT lists.bnl.gov>
  • Cc: "wenliang.billlee AT gmail.com" <wenliang.billlee AT gmail.com>
  • Subject: [Eic-projdet-pfrich-mechanical-design-l] Latest Prototype STEP
  • Date: Thu, 7 Dec 2023 16:13:44 +0000

Good morning,

 

I’ve attached the latest prototype STEP to this email (specifically for SBU) but also for anyone else’s use. This has the updated 120-bolt pattern with ΒΌ-20 bolts instead of M5 and the end ring profile as 0.75” x 1”. The mirror designs have not been fully finalized as I’m trying to get a meeting with Andy to discuss them.

 

Thanks,

Alex

Attachment: pfRICH Prototype 12-7-23.step
Description: pfRICH Prototype 12-7-23.step




Archive powered by MHonArc 2.6.24.

Top of Page