eic-projdet-pfrich-mechanical-design-l AT lists.bnl.gov
Subject: ePIC pfRICH mechanical design mailing list
List archive
[Eic-projdet-pfrich-mechanical-design-l] 1-5-24 - Vessel Material Dims Validation Meeting Notes
- From: Alex Eslinger <eslinger AT jlab.org>
- To: "eic-projdet-pfrich-mechanical-design-l AT lists.bnl.gov" <eic-projdet-pfrich-mechanical-design-l AT lists.bnl.gov>
- Subject: [Eic-projdet-pfrich-mechanical-design-l] 1-5-24 - Vessel Material Dims Validation Meeting Notes
- Date: Mon, 5 Feb 2024 20:58:40 +0000
Good afternoon,
In the meeting today, I made mention of a previous meeting (on 1/5/24) that I had with Tom (SBU), Bill (SBU), and Dan (BNL) regarding material dimension validation. In response, Charles (SBU) asked me if I could turn the notes into a few slides and send them out to the engineering list, so I have attached my notes (with some additional details added for clarity).
Please forgive any typos or missing information as this is just a rough outline of what we discussed that day.
Thanks, Alex Eslinger |
Attachment:
Vessel Material Dims Validation Meeting 1-5-24.pdf
Description: Vessel Material Dims Validation Meeting 1-5-24.pdf
-
[Eic-projdet-pfrich-mechanical-design-l] 1-5-24 - Vessel Material Dims Validation Meeting Notes,
Alex Eslinger, 02/05/2024
- Re: [Eic-projdet-pfrich-mechanical-design-l] 1-5-24 - Vessel Material Dims Validation Meeting Notes, Charles Joseph Naim, 02/05/2024
- Re: [Eic-projdet-pfrich-mechanical-design-l] 1-5-24 - Vessel Material Dims Validation Meeting Notes, Kiselev, Alexander, 02/07/2024
Archive powered by MHonArc 2.6.24.