Skip to Content.
Sympa Menu

eic-projdet-pfrich-mechanical-design-l - [Eic-projdet-pfrich-mechanical-design-l] 1-5-24 - Vessel Material Dims Validation Meeting Notes

eic-projdet-pfrich-mechanical-design-l AT lists.bnl.gov

Subject: ePIC pfRICH mechanical design mailing list

List archive

Chronological Thread  
  • From: Alex Eslinger <eslinger AT jlab.org>
  • To: "eic-projdet-pfrich-mechanical-design-l AT lists.bnl.gov" <eic-projdet-pfrich-mechanical-design-l AT lists.bnl.gov>
  • Subject: [Eic-projdet-pfrich-mechanical-design-l] 1-5-24 - Vessel Material Dims Validation Meeting Notes
  • Date: Mon, 5 Feb 2024 20:58:40 +0000

Good afternoon,

 

In the meeting today, I made mention of a previous meeting (on 1/5/24) that I had with Tom (SBU), Bill (SBU), and Dan (BNL) regarding material dimension validation. In response, Charles (SBU) asked me if I could turn the notes into a few slides and send them out to the engineering list, so I have attached my notes (with some additional details added for clarity).

 

Please forgive any typos or missing information as this is just a rough outline of what we discussed that day.

 

Thanks,

Alex Eslinger

Attachment: Vessel Material Dims Validation Meeting 1-5-24.pdf
Description: Vessel Material Dims Validation Meeting 1-5-24.pdf




Archive powered by MHonArc 2.6.24.

Top of Page