epic-backward-hcal-l AT lists.bnl.gov
Subject: Epic-backward-hcal-l mailing list
List archive
Re: [[Epic-backward-hcal-l] ] nHCal DSC meeting tomorrow at 1400h
- From: Leszek Kosarzewski <leszek.kosarzewski AT gmail.com>
- To: "Aschenauer, Elke" <elke AT bnl.gov>
- Cc: "epic-backward-hcal-l AT lists.bnl.gov" <epic-backward-hcal-l AT lists.bnl.gov>, "Brandenburg, Daniel" <brandenburg.89 AT osu.edu>, "Lisa, Michael" <lisa AT physics.osu.edu>
- Subject: Re: [[Epic-backward-hcal-l] ] nHCal DSC meeting tomorrow at 1400h
- Date: Fri, 28 Mar 2025 00:34:35 -0400
Dear Elke
Thank you again. Here are my responses:
śr., 26 mar 2025 o 22:01 Aschenauer, Elke <elke AT bnl.gov> napisał(a):
Dear All,indeed thank you for the very good discussions.I have some comments which I embed below.Cheers ElkeOn Mar 25, 2025, at 23:42, Leszek Kosarzewski <leszek.kosarzewski AT gmail.com> wrote:Dear ColleaguesI missed one more thing:12. nHcal can help distinguish scattered electron from other leptons coming from multi-lepton decays (eg. 4 leptons)this is not exactly what I was thinking if you have ep —> e’+j/psi+X —> one can detect the J/psi in the muon channel instead in the e+e- channel, and avoids not to know which one is the scattered lepton.
Thank you for clarification.
yes, we do not need the nHCal installed for the magnet acceptance test, so you have a little bit more time.Please thing about where you can contribute and we will discuss it next week and start making it happen.Best regards, Leszekwt., 25 mar 2025 o 19:24 Leszek Kosarzewski <leszek.kosarzewski AT gmail.com> napisał(a):Dear ColleaguesThank you to all who made this very productive mini-overview happen. We discussed a few important points:
- Well defined physics requiring nHCal, crucial to the core EIC physics program (low-x, low-Q^2), not well known structure of p,A
- We may keep in mind the vendors unofficially, but official selection of vendors is done by the Project via competition
- nHCal installation to happen after magnet acceptance tests: https://indico.bnl.gov/event/27365/attachments/60823/104491/Installation%20Schedule%20for%20the%20EIC.12.2024.docx
- Beam tests with high energy hadrons may not be necessary, not a focus
- Instead do tests with cosmic muons and low energy neutrons (ORNL spallation source O(100) MeV neutrons?)
Not sure I understand the comment 10 cm x 10 cm tiles may have efficiency/uniformity issues, are you referring to an issue with the SiPM on tile
- Test performance of different tile configurations: SiPM on tile, WLS fibers/plates (see STAR FCS HCal)
- https://drupal.star.bnl.gov/STAR/files/ForwardUpgrade.v20.pdf
- https://iopscience.iop.org/article/10.1088/1742-6596/587/1/012053
- 10 cm x 10 cm tiles may have efficiency/uniformity issues, smaller tiles offer smaller light yield, use thicker ones if needed
Yes, that's for the SiPM on tile case. Now it got me thinking, that the FCS HCal apparently doesn't have issues when using WLS plates. This points me to the idea that it's the field of view that causes the issues, not so much the distance traveled. We could then use thicker tiles and indeed place SiPMs in the corner. Just need to see if it indeed works.
- e/h~1 not important, because EEEMCal breaks compensation
- Neutron and muon detection efficiency most important for geometry determination
Use single particles to study performance, check extreme casesNext, include background with a full simulation and confirm realistic performance vs. backgroundMake adjustments to simple geometry, implement realistic module design once fixed
- Most likely need readout from separate layers to identify MIP signal
- Include EEMCal with a full test
- For neutrons, need good signal detection in the first few layers
To answer the question about the long integration time, it's illustrated by the picture in slide 64:There is a large delayed component coming from gammas from slow neutron capture. However, I looked into the details and this is not what's affecting the detection efficiency.We did it with pure simulation in npsim only, just to integrate energy deposits over time to study the neutron detection efficiency. This is a simple calculation and we are aware of this. The cut of 100 ns seemed like the best choice. We used it to provide parameters for the current, simple digitization model, which indeed applies the same cut with respect to the start time of the simulation (t=0). This is the limitation of the current digitization model. It will be improved with the new model, discussed last week. We did a check, where we used the time of the first hit as a reference/start time, as a realistic digitization would do. This is shown in slide 28:This points to no difference, which is good. We can go lower. However, we still used the start time t=0, since that's what the current digitization really does. Slide 25 also illustrates the delay of the first signal, due to neutron flight time.Best regards, Leszekpon., 24 mar 2025 o 14:10 Leszek Kosarzewski <leszek.kosarzewski AT gmail.com> napisał(a):Dear ColleaguesThis is a reminder, we are going to have a backward HCal DSC meeting tomorrow at 1400h:This time the plan is to have a planned mini-review with experts.Best regards, LeszekNote: Please do not feel obligated to respond to this message outside of your work hours.( `,_' )+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-) `\ +/ '. | Elke-Caroline Aschenauer (she/her/hers) =| `, -\,_ `-/ Brookhaven National Lab +,&&&&&V Physics 510 / 2-195 25 Corona Road =,&&&&&&&&: EIC: 1005 / 4-401 Rocky Point, NY, -,&&&&&&&&&&; P.O. Box 5000 11778 +| |&&&&&&&;\ Upton, NY 11973 =| | :_) _ Tel.: +1-631-344-4769 Tel.: +1-631-569-4290 -| | ;--' | Cell-USA: +1-757-2565224 +'--' `-.--. | =\_ | |—‘ Mail: elke AT bnl.gov elke.caroline AT me.com -`-._\__/ +=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=-+=
-
[[Epic-backward-hcal-l] ] nHCal DSC meeting tomorrow at 1400h,
Leszek Kosarzewski, 03/24/2025
-
Re: [[Epic-backward-hcal-l] ] nHCal DSC meeting tomorrow at 1400h,
Leszek Kosarzewski, 03/25/2025
-
Re: [[Epic-backward-hcal-l] ] nHCal DSC meeting tomorrow at 1400h,
Leszek Kosarzewski, 03/25/2025
-
Re: [[Epic-backward-hcal-l] ] nHCal DSC meeting tomorrow at 1400h,
Aschenauer, Elke, 03/26/2025
- Re: [[Epic-backward-hcal-l] ] nHCal DSC meeting tomorrow at 1400h, Leszek Kosarzewski, 03/28/2025
-
Re: [[Epic-backward-hcal-l] ] nHCal DSC meeting tomorrow at 1400h,
Aschenauer, Elke, 03/26/2025
-
Re: [[Epic-backward-hcal-l] ] nHCal DSC meeting tomorrow at 1400h,
Leszek Kosarzewski, 03/25/2025
- <Possible follow-up(s)>
- [[Epic-backward-hcal-l] ] nHcal DSC meeting tomorrow at 1400h, Leszek Kosarzewski, 03/31/2025
-
Re: [[Epic-backward-hcal-l] ] nHCal DSC meeting tomorrow at 1400h,
Leszek Kosarzewski, 03/25/2025
Archive powered by MHonArc 2.6.24.