epic-backward-hcal-l AT lists.bnl.gov
Subject: Epic-backward-hcal-l mailing list
List archive
Re: [[Epic-backward-hcal-l] ] nHCal - preparations for DAC review
- From: "Brandenburg, Daniel" <brandenburg.89 AT osu.edu>
- To: "Prozorov, Alexandr" <alexandr.prozorov AT cvut.cz>, "Riedl, Caroline" <criedl AT illinois.edu>, "Corey, Sam" <corey.90 AT buckeyemail.osu.edu>, "epic-backward-hcal-l AT lists.bnl.gov" <epic-backward-hcal-l AT lists.bnl.gov>, "Lisa, Mike" <lisa AT physics.osu.edu>, Leszek Kosarzewski <leszek.kosarzewski AT gmail.com>, "Stefaniak, Maria" <stefaniak.9 AT osu.edu>, "Khyzhniak, Yevheniia" <khyzhniak.1 AT buckeyemail.osu.edu>
- Subject: Re: [[Epic-backward-hcal-l] ] nHCal - preparations for DAC review
- Date: Wed, 28 May 2025 13:25:34 +0000
Hi Sasha,
This is excellent, thanks for the additional work on this. These are much easier to interpret.
Best, Daniel Brandenburg Assistant Professor College of Arts and Sciences Department of Physics Ohio State University
From:
Prozorov, Alexandr <alexandr.prozorov AT cvut.cz> Hello Caroline, here is the attached plot with fits . I have now fitted it with different function and included uncertainty from fit(not visible under markers). There are 4 needed plots in selected_plots. pdf Preview for mail only: With best
Hello Caroline, here is the attached plot with fits .
From: Riedl, Caroline <criedl AT illinois.edu>
Hi Sam,
Many thanks, this is GREAT!
I'll continue tuning the message, for now attaching the screenshot of the current DAC slide. Any comments are welcome.
Best, Caroline
⎯⎯⎯⎯⎯⎯⎯ Caroline Riedl UIUC From: Corey, Sam <corey.90 AT buckeyemail.osu.edu>
Hi Caroline, all,
I attached a zip file containing a bunch of plots with different combinations of configurations, as well as plots showing the difference between each configuration and the default.
I also caught a bug on my end that effected our conversation earlier-the 20 layer, 2cm absorber, 8cm scintillator configurations were missing from the plot. This is quite important because these are the configurations with the highest efficiency. The conclusions we can draw from this are:
The scintillator/absorber ratio causes the most change in efficiency. The least efficient configurations have r=0.1, and the most efficient has 0.4. The LFHCal-like configuration (1.52 cm absorber, 25 layers) has r=0.26, and the 20 layer options with 4mm and 8mm scintillator have r=0.2 and 0.4 respectively.
Sorry I missed this in my first pass at the plots!
Thanks everyone, Sam
This might have ended up being a duplicate email; I’m not sure the one I sent to just the list went through for some reason.
From:
epic-backward-hcal-l-request AT lists.bnl.gov <epic-backward-hcal-l-request AT lists.bnl.gov> on behalf of Riedl, Caroline <criedl AT illinois.edu> Dear colleagues, in particular those who prepare(d) plots for the DAC review, I uploaded a new version of the DAC slides to today's nHCal indico, https: //indico. bnl. gov/event/28192/. Because of the ongoing rehearsal sessions for the DAC review, Dear colleagues, in particular those who prepare(d) plots for the DAC review,
I uploaded a new version of the DAC slides to today's nHCal indico, https://indico.bnl.gov/event/28192/.
Because of the ongoing rehearsal sessions for the DAC review, my time in today's nHCal meeting will be limited, and I would like to get my message to you across ahead of time. To save time, I wrote down my questions and comments below. It would be great if you could clarify my questions (in the meeting or by email) and send updated material as quickly as possible - ideally by tomorrow morning. The rehearsal of the talk will be around 11:00 ET tomorrow (May 28). The slides have to be in final shape ~ next Monday (June 2).
Many thanks! Caroline
⎯⎯⎯⎯⎯⎯⎯ Caroline Riedl UIUC From: epic-backward-hcal-l-request AT lists.bnl.gov <epic-backward-hcal-l-request AT lists.bnl.gov>
on behalf of Leszek Kosarzewski <leszek.kosarzewski AT gmail.com>
Dear Colleagues
I calculated the sampling fraction for neutrons and pi- (and comparison) vs. kinetic energy. I used the default geometry and uploaded the plots here:
Best regards, Leszek
wt., 27 maj 2025 o 05:26 Leszek Kosarzewski <leszek.kosarzewski AT gmail.com> napisał(a):
|
-
[[Epic-backward-hcal-l] ] nHCal DSC meeting tomorrow at 1400h BNL time,
Leszek Kosarzewski, 05/26/2025
-
Re: [[Epic-backward-hcal-l] ] nHCal DSC meeting tomorrow at 1400h BNL time,
Leszek Kosarzewski, 05/26/2025
-
Re: [[Epic-backward-hcal-l] ] nHCal DSC meeting tomorrow at 1400h BNL time,
Leszek Kosarzewski, 05/27/2025
-
[[Epic-backward-hcal-l] ] nHCal - preparations for DAC review,
Riedl, Caroline, 05/27/2025
-
Re: [[Epic-backward-hcal-l] ] nHCal - preparations for DAC review,
Corey, Sam, 05/27/2025
-
Re: [[Epic-backward-hcal-l] ] nHCal - preparations for DAC review,
Riedl, Caroline, 05/27/2025
- Re: [[Epic-backward-hcal-l] ] nHCal - preparations for DAC review, Leszek Kosarzewski, 05/28/2025
-
Re: [[Epic-backward-hcal-l] ] nHCal - preparations for DAC review,
Prozorov, Alexandr, 05/28/2025
- Re: [[Epic-backward-hcal-l] ] nHCal - preparations for DAC review, Brandenburg, Daniel, 05/28/2025
- Re: [[Epic-backward-hcal-l] ] nHCal - preparations for DAC review, Riedl, Caroline, 05/28/2025
- Re: [[Epic-backward-hcal-l] ] nHCal - preparations for DAC review, Prozorov, Alexandr, 05/28/2025
- Re: [[Epic-backward-hcal-l] ] nHCal - preparations for DAC review, Leszek Kosarzewski, 05/28/2025
- Re: [[Epic-backward-hcal-l] ] nHCal - preparations for DAC review, Corey, Sam, 05/28/2025
- Re: [[Epic-backward-hcal-l] ] nHCal - preparations for DAC review, Prozorov, Alexandr, 05/28/2025
- Re: [[Epic-backward-hcal-l] ] nHCal - preparations for DAC review, Leszek Kosarzewski, 05/28/2025
- Re: [[Epic-backward-hcal-l] ] nHCal - preparations for DAC review, Leszek Kosarzewski, 05/28/2025
- Re: [[Epic-backward-hcal-l] ] nHCal - preparations for DAC review, Leszek Kosarzewski, 05/28/2025
- Re: [[Epic-backward-hcal-l] ] nHCal - preparations for DAC review, Riedl, Caroline, 05/29/2025
- Re: [[Epic-backward-hcal-l] ] nHCal - preparations for DAC review, Riedl, Caroline, 05/29/2025
-
Re: [[Epic-backward-hcal-l] ] nHCal - preparations for DAC review,
Riedl, Caroline, 05/27/2025
-
Re: [[Epic-backward-hcal-l] ] nHCal - preparations for DAC review,
Corey, Sam, 05/27/2025
-
[[Epic-backward-hcal-l] ] nHCal - preparations for DAC review,
Riedl, Caroline, 05/27/2025
-
Re: [[Epic-backward-hcal-l] ] nHCal DSC meeting tomorrow at 1400h BNL time,
Leszek Kosarzewski, 05/27/2025
-
Re: [[Epic-backward-hcal-l] ] nHCal DSC meeting tomorrow at 1400h BNL time,
Leszek Kosarzewski, 05/26/2025
Archive powered by MHonArc 2.6.24.