Skip to Content.
Sympa Menu

phys-npps-mgmt-l - Re: [Phys-npps-mgmt-l] PanDA for sPHENIX slides

phys-npps-mgmt-l AT lists.bnl.gov

Subject: NPPS Leadership Team

List archive

Chronological Thread  
  • From: Torre Wenaus <wenaus AT gmail.com>
  • To: pinkenburg <pinkenburg AT bnl.gov>
  • Cc: NPPS leadership team <phys-npps-mgmt-l AT lists.bnl.gov>
  • Subject: Re: [Phys-npps-mgmt-l] PanDA for sPHENIX slides
  • Date: Thu, 15 Jul 2021 15:38:36 -0400

Hi Chris,
The Jamie comment is only in there to goad you guys (before the review) to take it to Jamie before the review :-) I will take it out.
I will clarify: there is production operations, and there is technical operations to keep the PanDA server etc running.
  Torre

On Thu, Jul 15, 2021 at 3:36 PM pinkenburg via Phys-npps-mgmt-l <phys-npps-mgmt-l AT lists.bnl.gov> wrote:
Hi Torre,

looks good, just two comments:

on slide 7 we need to take out the plan to ask Jamie (maybe just saying need to identify manpower, that's a fair statement), we should really ask him before he hears in the review of the plan to ask him. I did ask Gunther and Dave but haven't heard anything. In any case I don't think this will happen before Monday.

There seem to be contradicting statements on slide 9:
Operational support for running BNL PanDA and associated services and databases (on SDCC VM resources) will be provided by the PanDA team

and slide 10:
steady state operational support is needed also and we have at least a beginning to addressing that

This is one of the most important points in this talk and it should be clear if the PanDA team will provide operational support or if additional support will be needed.

Chris


On 7/15/2021 2:54 PM, Torre Wenaus via Phys-npps-mgmt-l wrote:
Hi Chris & all,
Here are draft slides for the PanDA half of the NPPS talk at the sPHENIX review on Monday. The other half is a conditions DB talk that Paul will give. For discussion in the leadership team meeting tomorrow. Comments appreciated.


  Torre

--
-- Torre Wenaus, BNL NPPS Group, ATLAS Experiment
-- BNL 510A 1-222 | 631-681-7892 |  wenaus AT gmail.com | npps.bnl.gov | wenaus.com
-- NPPS Mattermost room: https://chat.sdcc.bnl.gov/npps/channels/town-square

_______________________________________________
Phys-npps-mgmt-l mailing list
Phys-npps-mgmt-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/phys-npps-mgmt-l

-- 
*************************************************************

Christopher H. Pinkenburg	;    pinkenburg AT bnl.gov
				;    http://www.phenix.bnl.gov/~pinkenbu

Brookhaven National Laboratory	;    phone: (631) 344-5692
Physics Department Bldg 510 C	;    fax:   (631) 344-3253
Upton, NY 11973-5000

*************************************************************
_______________________________________________
Phys-npps-mgmt-l mailing list
Phys-npps-mgmt-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/phys-npps-mgmt-l


--
-- Torre Wenaus, BNL NPPS Group, ATLAS Experiment
-- BNL 510A 1-222 | 631-681-7892 |  wenaus AT gmail.com | npps.bnl.gov | wenaus.com
-- NPPS Mattermost room: https://chat.sdcc.bnl.gov/npps/channels/town-square



Archive powered by MHonArc 2.6.24.

Top of Page