phys-npps-mgmt-l AT lists.bnl.gov
Subject: NPPS Leadership Team
List archive
- From: Torre Wenaus <wenaus AT gmail.com>
- To: NPPS leadership team <Phys-npps-mgmt-l AT lists.bnl.gov>
- Subject: [Phys-npps-mgmt-l] Fwd: Wire-Cell LDRD-A draft
- Date: Fri, 30 Jun 2023 12:20:07 -0400
FYI. The very nicely targeted 1-pager attached, became the following submitted version after input from the bosses.
As submitted:
Title: High-Efficiency Accelerated Computing for DUNE
Other Investigators: Brett Viren (PO), Chao Zhang (PO), Xin Qian (PO), Torre Wenaus (PO), Douglas Benjamim (PO)
Abstract: We propose the development of a high-efficiency heterogeneous computing system, specifically tailored for the simulation and reconstruction of the Deep Underground Neutrino Experiment (DUNE). The proposed research will develop a multi-layered acceleration framework including an efficient resource management infrastructure and acceleration solutions for specific algorithms. The R&D will explore a range of techniques, including multi-threading, GPU acceleration, distributed resource management, and AI/ML-based reconstruction algorithms. The objective is to significantly enhance DUNE's computing capacity, enabling it to accommodate more sophisticated yet superior-performing algorithms. The advancement will, in turn, bolster DUNE’s potential for physics discoveries. Capitalizing on BNL's key Wire-Cell software package, this R&D aims to expand our expertise in constructing an advanced, high-efficiency computing system and further reinforce BNL’s position in the DUNE Software and Computing program that is expected to start soon.
Principal Investigator: Haiwang Yu (PO)
---------- Forwarded message ---------
From: Torre Wenaus <wenaus AT gmail.com>
Date: Thu, Jun 29, 2023 at 10:17 AM
Subject: Wire-Cell LDRD-A draft
To: Hong Ma <hma AT bnl.gov>, Denisov, Dmitri <denisovd AT bnl.gov>
Cc: Kettell, Steven <kettell AT bnl.gov>
From: Torre Wenaus <wenaus AT gmail.com>
Date: Thu, Jun 29, 2023 at 10:17 AM
Subject: Wire-Cell LDRD-A draft
To: Hong Ma <hma AT bnl.gov>, Denisov, Dmitri <denisovd AT bnl.gov>
Cc: Kettell, Steven <kettell AT bnl.gov>
Hi,
Here is an LDRD-A 1-pager for your comments, Haiwang as PI, to build up Wire-Cell as the BNL branded driver for a strong BNL role in DUNE’s S&C program.
Torre
--
-- Torre Wenaus, BNL NPPS Group, ATLAS Experiment
-- BNL 510A 1-222 | 631-681-7892
-- Torre Wenaus, BNL NPPS Group, ATLAS Experiment
-- BNL 510A 1-222 | 631-681-7892
Attachment:
Haiwang LDRD_one_page_v5.docx
Description: application/vnd.openxmlformats-officedocument.wordprocessingml.document
- [Phys-npps-mgmt-l] Fwd: Wire-Cell LDRD-A draft, Torre Wenaus, 06/30/2023
Archive powered by MHonArc 2.6.24.