Hello Christof, (repeating here what we discussed semi-privately)

On the track-based space charge distortion reconstruction, there really have not been much new things since last collaboration meeting, mainly because things where in a reasonable state by then already.

Obviously, there have been developments on making the TPOT happening for real (something which is critical to track-based SC corrections), but I expect this to be covered in a separate talk in the detector section

To me, the newest thing that should really be presented at the collaboration meeting is the effort, led by Ross, to put all the bits and pieces we have on the TPC SC distortion correction in a comprehensive flow chart, organized in a first-pass and second-pass reconstruction.

We should then emphasize which parts of this flowchart are already there (committed, ready to use), which are 'almost there', and which still need some significant work. I'll let Ross comment on this (and hopefully volunteer to present this).

On that topic, one of the missing parts of the flow-chart, namely the ability for the first-pass reconstruction to store the per-job space-charge correction matrices in independent, tiny files, together with a separate process to aggregate, invert these matrices and produce a full map, has been pushed to our repositories last week. So we are one step closer to having this flow chart turned into a real thing.

That is all the input I have.

Best,

Hugo



On 6/4/2021 8:58 AM, Christof Roland via sPHENIX-calibration-l wrote:
Thanks to Klaus for pointing this out, obviously the mail should
have started with "DeaR Calibration TaskFocre Members"

I sincerely apologize!

This will go onto my list of the more memorable typos or autocorrect failures.

Cheers

Christof


On 4. Jun 2021, at 16:40, Christof Roland via sPHENIX-calibration-l
<sphenix-calibration-l AT lists.bnl.gov> wrote:

Dead Calibration TaskForce Members,

we are supposed to provide feedback to Dave & Gunther so they
can set up the program for the upcoming collaboration meeting.

Could you please provide us with a few line response on the
topics you would want to highlight at the collaboration meeting?

Please also let us know if you would prefer the usual layout
if a separate report by each subcommittee or if we should
change for this particular meeting to a shorter executive style
report to keep the meeting time short and leaving more time for
discussion, as Gunther and Dave suggested last General Meeting

Cheers

Takao & Christof
_______________________________________________
sPHENIX-calibration-l mailing list
sPHENIX-calibration-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/sphenix-calibration-l
_______________________________________________
sPHENIX-calibration-l mailing list
sPHENIX-calibration-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/sphenix-calibration-l




Archive powered by MHonArc 2.6.24.

Top of Page