sphenix-calibration-l AT lists.bnl.gov
Subject: Sphenix-calibration-l mailing list
List archive
Re: [Sphenix-calibration-l] Calo Calibration draft slides
- From: Takao Sakaguchi <takao AT bnl.gov>
- To: sphenix-calibration-l AT lists.bnl.gov
- Subject: Re: [Sphenix-calibration-l] Calo Calibration draft slides
- Date: Thu, 6 Jan 2022 12:50:05 -0500
HI Megan,
Thanks for making a set of nice slides. I think they have most information
that the collaboration have to know. One comment I have is that the each
calibration has timescale of "end of MDC2", and it would be nice if you
could include some estimate of absolute timescale (like 1 mo or 2 mo),
under the currently available workforce. This will be a nice advertisement
of the service work.
Cheers,
Takao
On 1/5/22 10:02 PM, Megan Connors via sPHENIX-calibration-l wrote:
Dear all,
You can find draft of the calorimeter calibration slides on the indico of the Task Force meeting:
https://indico.bnl.gov/event/14047/contributions/58381/attachments/39084/64647/CollabMeetingJan2022_CaloCalib_draft.pdf
I will polish the slides a bit more in the morning. Any feedback is appreciated and can be incorporated before the talk in the afternoon.
Thanks,
-Megan
_______________________________________________
sPHENIX-calibration-l mailing list
sPHENIX-calibration-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/sphenix-calibration-l
-
[Sphenix-calibration-l] Calo Calibration draft slides,
Megan Connors, 01/05/2022
- Re: [Sphenix-calibration-l] Calo Calibration draft slides, Takao Sakaguchi, 01/06/2022
- Re: [Sphenix-calibration-l] Calo Calibration draft slides, Maxim Potekhin, 01/06/2022
Archive powered by MHonArc 2.6.24.