Skip to Content.
Sympa Menu

sphenix-calibration-l - [Sphenix-calibration-l] subsystems (and spin, centrality, reaction plane) - please fill out our standing document about the calibration status

sphenix-calibration-l AT lists.bnl.gov

Subject: Sphenix-calibration-l mailing list

List archive

Chronological Thread  
  • From: pinkenburg <pinkenburg AT bnl.gov>
  • To: "sphenix-calibration-l AT lists.bnl.gov" <sphenix-calibration-l AT lists.bnl.gov>
  • Subject: [Sphenix-calibration-l] subsystems (and spin, centrality, reaction plane) - please fill out our standing document about the calibration status
  • Date: Tue, 19 Mar 2024 16:26:30 -0400

Hi folks,

to get the process started which should enable us to get ready for running regular (run-wise) calibrations which need to get into our production workflow. I am sure we have most of the pieces around but we need to coordinate this.
The goal is to have the code in github (under our core software), macros to run it in our macro repo, are able to run this under the sphnxpro account, don't rely on magic files in some user directory and know in which order and on what kind of data the calibration should run (and how many events it needs). I would leave the distortion corrections out of this for the time being - that's another can of worms:

https://docs.google.com/document/d/1a8-juoPKH2HITHlJD2IZ6LtxKsxk5EUJsA5OCXAqFmY/edit

We will set aside time on the software meeting to talk about this

Chris

--
*************************************************************

Christopher H. Pinkenburg ; pinkenburg AT bnl.gov
; http://www.phenix.bnl.gov/~pinkenbu

Brookhaven National Laboratory ; phone: (631) 344-5692
Physics Department Bldg 510 C ; fax: (631) 344-3253
Upton, NY 11973-5000

*************************************************************




  • [Sphenix-calibration-l] subsystems (and spin, centrality, reaction plane) - please fill out our standing document about the calibration status, pinkenburg, 03/19/2024

Archive powered by MHonArc 2.6.24.

Top of Page