Hi all,
I wanted to update my presentation on Monday with a final slide to show the module that was made after being machined and cut. The slide shows that the final density we have is 9.17g/cm^3. I included a few pictures
as well. We are next repeating this procedure to see if we can cut down the time to make the bathtub module.
Best,