sphenix-emcal-l AT lists.bnl.gov
Subject: sPHENIX EMCal discussion
List archive
- From: eric mannel <mannel AT bnl.gov>
- To: sphenix-hcal-l AT lists.bnl.gov, sphenix-emcal-l AT lists.bnl.gov
- Subject: [Sphenix-emcal-l] Next Stop FNAL
- Date: Mon, 28 Mar 2016 15:44:21 -0400
Since John was not around to announce the departure, I thought I would let everyone know that the EMCal/HCal protoytpes have left town, next stop FNAL.
Attached is a picture just as the last items were being placed on the truck prior to departure. Unfortunately I was not able to hang out for the actual departure of the truck.
Estimated arrival is Wednesday.
Eric
--
Eric J. Mannel, Ph.D.
PHENIX Group
Physics Dept.
Brookhaven National Laboratory
631/344-7626 (Office)
914/659-3235 (Cell)
Attachment:
2016-03-28 13.48.28.jpg
Description: JPEG image
- [Sphenix-emcal-l] Next Stop FNAL, eric mannel, 03/28/2016
Archive powered by MHonArc 2.6.24.