We did a lot of running over the weekend with the EMCAL, and I would like to finish up running with the EMCAL on the MT6.2c table this week.

The remaining things that I can think of are:

- another vertical MIP scan through the CG (angle=90)
- a vertical MIP scan rotated 180 dgrees ("backward") right after [Sean and I tried to do this over the weekend, but we couldn't turn the EMCAL around; Todd helped me move the PbGl this morning to allow that]
- at least one more energy scan (1,2,4,8,12,16 GeV) (angle=55; another angle?)

The differential converter got hung up during the position scans, and I didn't notice it for a while, so quite a bit of that data does not have Cerenkov information; we can take another data set on that, it's easy, if long.

What else? Right now we're doing another MIP scan, how about we move the EMCAL meeting earlier in the day tomorrow so we can decide what to do next. I'd like to be doing combined running next weekend, so it would be good to get through as much as possible this week.

--
John Haggerty