Hello,
Here the requested outer HCal Assembly and Testing update:
- five sectors are fully assembled, tested, working, calibration runs taken, put away in storage ready for installation in sPHENIX.
- ten sectors are on the assembly tables; of those:
- six are fully assembled (modulo thermistors, which only four of those have, see below) and are being tested
- two are full assembled; they need electronics boxes, and then can be tested (also need thermistors)
- two are missing signal cables and thermistors (see below)
- parts
- signal cables and thermistors are coming in at a slower rate than anticipated
- the rate for both is about one sector per week
- this might sound OK since it matches the rate at which we need to assemble the sectors according to P6
- but it actually limits the assembly speed; here’s how:
- we are already three weeks behind due to delays in parts; at a rate of one per week, we will never be able to catch up
- our labor resources are not steady; much of the work is done by visitors, which come in bursts; without a supply of parts in hand, we won’t be able to optimize the labor resources and will fall behind farther
Regards,
Stefan
—
---------------------------------------------------------------------------------
Stefan Bathe
Stefan Bathe
Professor of Physics
Baruch College, CUNY
Baruch: BNL:
17 Lexington Ave Bldg. 510
office 940 office 2-229
phone 646-660-6272 phone 631-344-8490
----------------------------------------------------------------------------------
Baruch College, CUNY
Baruch: BNL:
17 Lexington Ave Bldg. 510
office 940 office 2-229
phone 646-660-6272 phone 631-344-8490
----------------------------------------------------------------------------------
On Dec 21, 2020, at 11:31 AM, Lajoie, John G [PHYSA] <lajoie AT iastate.edu> wrote:_______________________________________________Dear HCAL’ers:Due to a conflict with the iHCAL, EMCal and TPC installation review, there will be NO HCAL meeting this Tuesday, December 22nd. I would ask Megan and Stefan to post brief updates to the HCAL list so everyone is up-to-date.Our next HCAL meeting will be Tuesday, January 5th. Have a happy and safe holidays everyone!Regards,John Lajoie
John Lajoiehe, him, hisProfessor of PhysicsIowa State University(515) 294-6952
sPHENIX-HCal-l mailing list
sPHENIX-HCal-l AT lists.bnl.gov
https://urldefense.proofpoint.com/v2/url?u=https-3A__lists.bnl.gov_mailman_listinfo_sphenix-2Dhcal-2Dl&d=DwICAg&c=dTXc8cCP8suVpClwB1HRHQACHN4UFMgL7MtSjCbKyts&r=VpzLtnjcGB03vfJuG_p478bcDf7zDOFn2OeUM-jusdY&m=cXCz_VJdqTPSEC9vPapYBLMpPotBAyE-YH00vA4pW6c&s=getxdyE9XNr8nxAdQvevgK58UMVDNy3_Ye7XIeIuZfY&e=
-
[Sphenix-hcal-l] No HCAL meeting 12/22,
Lajoie, John G [PHYSA], 12/21/2020
- Re: [Sphenix-hcal-l] [assembly and testing update] No HCAL meeting 12/22, Stefan Bathe, 12/22/2020
- Re: [Sphenix-hcal-l] [outer HCal update] No HCAL meeting 12/22, Stefan Bathe, 12/22/2020
Archive powered by MHonArc 2.6.24.