sphenix-hcal-l AT lists.bnl.gov
Subject: sPHENIX HCal discussion
List archive
- From: "Boose, Stephen" <boose AT bnl.gov>
- To: "Bathe, Stefan" <bathe AT bnl.gov>, "sphenix-hcal-l AT lists.bnl.gov" <sphenix-hcal-l AT lists.bnl.gov>
- Cc: "Miraglia, Damon" <dmiraglia AT bnl.gov>, "Haggerty, John" <haggerty AT bnl.gov>, "Mannel, Eric" <mannel AT bnl.gov>, Rosi Reed <rosijreed AT lehigh.edu>
- Subject: [Sphenix-hcal-l] ADC Crate Remote Power Control
- Date: Mon, 11 Mar 2024 15:31:48 +0000
Hi Stefan,
We have this remote ADC crate power control GUI in place which can be used by experts in such rare cases that a crate may need to be power cycled from outside the IR without killing the whole rack. This morning I finished testing the EmCAL and sEPD portion – tested OK.
To finish the HCal portion we would need an opportunity at the HCal group’s convenience to have Damon shut down 2E2 and connect the MegaPAC control cable there. This could take an hour or so because it requires moving some cables. Then I’d be able to test both 2E2 and 2W2.
So please let us know of a convenient time for this interruption – no rush J
Many thanks, Steve Boose Principal Electrical Engineer sPHENIX Experiment Brookhaven National Laboratory BLDG 510C Upton, NY 11973 Office: 631 344-2897
|
Attachment:
backendGUI.png
Description: backendGUI.png
-
[Sphenix-hcal-l] ADC Crate Remote Power Control,
Boose, Stephen, 03/11/2024
-
Re: [Sphenix-hcal-l] ADC Crate Remote Power Control,
Rosi Reed, 03/11/2024
-
Re: [Sphenix-hcal-l] ADC Crate Remote Power Control,
Boose, Stephen, 03/11/2024
- Re: [Sphenix-hcal-l] ADC Crate Remote Power Control, Anderson, Derek [PHYSA], 03/11/2024
-
Re: [Sphenix-hcal-l] ADC Crate Remote Power Control,
Boose, Stephen, 03/11/2024
-
Re: [Sphenix-hcal-l] ADC Crate Remote Power Control,
Stefan Bathe, 03/12/2024
- Re: [Sphenix-hcal-l] ADC Crate Remote Power Control, Boose, Stephen, 03/13/2024
-
Re: [Sphenix-hcal-l] ADC Crate Remote Power Control,
Rosi Reed, 03/11/2024
Archive powered by MHonArc 2.6.24.