sphenix-l AT lists.bnl.gov
Subject: sPHENIX is a new detector at RHIC.
List archive
Re: [Sphenix-l] sPHENIX simulation meetings, Tue Jan 5th, 1PM EST [minutes]
- From: Chris Pinkenburg <pinkenburg AT bnl.gov>
- To: "sphenix-l AT lists.bnl.gov" <sphenix-l AT lists.bnl.gov>, "sphenix-software-l AT lists.bnl.gov" <sphenix-software-l AT lists.bnl.gov>
- Subject: Re: [Sphenix-l] sPHENIX simulation meetings, Tue Jan 5th, 1PM EST [minutes]
- Date: Wed, 6 Jan 2016 12:44:58 -0500
Happy new year - here are the brief minutes.
Attending (BNL) Achim, Chris, Jeff, Megan
Phone/BlueJeans: Jin, John Lajoie, Martin, Mike, Murad
the new G4 version needs gcc 4.8, our code compiles with it and Mike did a test for the tracking (after the meeting) which shows it works. We didn't hear any calorimeter assessment but will just go ahead and switch to the new compiler as soon as I get around doing it (today hopefully). Then this will become the default, the C++11 compiler flag (-std=c++11) will be enabled by default (which might need cosmetic fixes in packages which currently don't use it).
I've been running cppcheck on many of our packages and fix warnings/complaints by it. This should be part of the tests being run before code makes it into our repository. Even if this doesn't result in a detection of many real bugs it just enforces a better coding.
We had a nuts and bolts discussion about Mikes new Shower object which is almost ready for prime time. It drastically reduces the DST size since it replaces the G4Hits. To speed the deployment up we'll push this out soon and see how far we get with it (rather than thinking of all the theoretical cases where we might need some addition).
Disk space is a bit tight right now while we move data in rcf from BlueArc to gpfs. I am using this opportunity to disentangle PHENIX from sPHENIX. We need to think how we want to organize ourselves (unlimited disk space for everybody is not a viable option).
Chris
On 01/04/2016 12:26 PM, Huang, Jin wrote:
Dear All,
Happy New Year, and this is a reminder for our weekly simulation meeting Tue
Jan 5th, 1PM EST.
Currently on the agenda, there are several updates during the holiday times,
include new compiler, Geant4 version and test productions from Chris. Then
Mike will introduce a compact truth output via the new shower objects. More
contributions are welcomed too.
Please note a new room (BNL 510C 2-219) will be used for this meeting (and
most future meetings). Also a new phone bridge (619960505) will be used.
Although I will be on travel, Chris will host the discussion.
The agenda page is at https://indico.bnl.gov/conferenceDisplay.py?confId=1645.
* For residents at BNL, we will meet at the 2-219 conference room
* To join the Meeting via phone bridge:
https://bluejeans.com/619960505
* To join via Phone:
1) Dial:
+1.408.740.7256
+1.888.240.2560(US Toll Free)
+1.408.317.9253(Alternate number)
(see all numbers - http://bluejeans.com/numbers)
2) Enter Conference ID: 619960505
Cheers,
Jin
______________________________
Jin HUANG
Brookhaven National Laboratory
Physics Department, Bldg 510 C
Upton, NY 11973-5000
Office: 631-344-5898
Cell: 757-604-9946
______________________________
_______________________________________________
Sphenix-software-l mailing list
Sphenix-software-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/sphenix-software-l
--
*********************************************************
Christopher H. Pinkenburg ; pinkenburg AT bnl.gov
Brookhaven National Laboratory ; phone: (631) 344-5692
Physics Department Bldg 510 C ; fax: (631) 344-3253
Upton, NY 11973-5000
http://www.phenix.bnl.gov/~pinkenbu/
*********************************************************
-
[Sphenix-l] [New room and phonebridge] sPHENIX simulation meetings, Tue Jan 5th, 1PM EST,
Huang, Jin, 01/04/2016
- Re: [Sphenix-l] sPHENIX simulation meetings, Tue Jan 5th, 1PM EST [minutes], Chris Pinkenburg, 01/06/2016
Archive powered by MHonArc 2.6.24.