sphenix-l AT lists.bnl.gov
Subject: sPHENIX is a new detector at RHIC.
List archive
Re: [Sphenix-l] minutes from sPHENIX general meeting on 2/17/2017
- From: Itaru Nakagawa <itaru AT bnl.gov>
- To: sphenix-l AT lists.bnl.gov
- Subject: Re: [Sphenix-l] minutes from sPHENIX general meeting on 2/17/2017
- Date: Fri, 24 Feb 2017 01:21:40 -0500
Dear Collaborators,
I have some comments on the material budget of INTT.
On 2017/02/23 15:21, David Morrison wrote:
[Current Tracking Issues by Tony Frawley]The current GEANT model is overestimating the material, particularly HDI part for following reasons.
Tracking system is moving to more realistic geometry.
Updated MAPS and INTT from cylindrical geometry to ladders.
INTT is proving to be twice as thick in the realistic geometryt
as in the cylinder cell geometry. This caused the Upsilon mass width to
be wider than specs. RIKEN is exploring possibility to improve tracking
to mitigate this effect.
1) The signal layers are assumed solid copper plane.
2) The solid plane bias and GND layers to be replaced by mesh pattern.
These will reduce the material budget down to less than 1% level per ladder even including the overlapping ladder.
We will update the GEANT model soon.
Best regards,
-itaru
-
[Sphenix-l] minutes from sPHENIX general meeting on 2/17/2017,
David Morrison, 02/23/2017
-
Re: [Sphenix-l] minutes from sPHENIX general meeting on 2/17/2017,
Itaru Nakagawa, 02/24/2017
- Re: [Sphenix-l] minutes from sPHENIX general meeting on 2/17/2017, Itaru Nakagawa, 02/24/2017
-
Re: [Sphenix-l] minutes from sPHENIX general meeting on 2/17/2017,
Itaru Nakagawa, 02/24/2017
Archive powered by MHonArc 2.6.24.