The CDR will be frozen for the CD-1 review in about two weeks (April 30), followed by about a week of general collaboration review, so that by May 7 we can send it to the review committee.
People are working hard to produce new physics and detector performance plots for the CDR, which they should insert in the text when the relevant working groups or detector groups are satisfied.
There are still some holes and inconsistencies in the text, and I've started to search them out and tag them with \todo{fix this} which gives an index of the questionable parts at the end. If you can't fix something, you can at least point it out this way, which is better than leaving TEXT IN ALL CAPS in the text which looks like the CDR is being held for ransom and are easily overlooked.
Instructions on editing the text and a link to the live document on Overleaf is here:
https://wiki.bnl.gov/sPHENIX/index.php/CDR
Thanks again to everyone who has contributed to this document, and who will in the coming weeks.
--
John Haggerty