Re: [Sphenix-l] 60th sPHENIX General Meeting today
- From: EdwardOBrien <eobrien AT bnl.gov>
- To: sookhyun lee <dr.sookhyun.lee AT gmail.com>, Gunther M Roland <rolandg AT mit.edu>
- Cc: sphenix-l AT lists.bnl.gov
- Subject: Re: [Sphenix-l] 60th sPHENIX General Meeting today
- Date: Mon, 19 Nov 2018 09:45:18 -0500
Hi Sookhyun, A correction on p9 on John Haggerty's talk. It is not a question of whether the detectors will fit (they will), but whether the beampipe needs to be modified in the IR region at large +/- Z to accommodate the crossing angle, and whether the magnets in the tunnel need to be translated a small amount. Ed On 11/18/2018 1:18 PM, sookhyun lee
wrote:
Dear all,
Below are the minutes of the 60th general meeting.
Best regards,
Sookhyun
- cQCD TG news: Nils stepped down as co-convener.
Christine will stay on as convener, but steps down as EIC
detector study group leader.
- computing retreat at BNL: There were presentations from
various BNL groups and discussions. Homework from summer
computing review were addressed. No clear conclusion was
drawn and more discussions will be needed at the
collaboration meeting.
- INTT meeting at RIKEN: INTT group held a 1-day meeting
at RIKEN with Prof. Chia-Ming Kuo (from NCU/Taiwan) and
discussed possible involvement of NCU in INTT project. Will
apply for membership in December.
- Pan-Asian collaboration meeting: A Pan-Asian
collaboration meeting has been proposed for March 2019 to
better facilitate Asian institutions' current involvement in
the project, they are playing an important role in INTT and
EMCal. Will be supported by NCU and possibly by MIT.
- CERN recognized experiment: Processes to have sPHENIX
as a CERN recognized experiment is in progress. Application
completed. A meeting at CERN with Luciano is scheduled
tentatively for Nov. 29 to explore training/collaboration
opportunities related to ALICE IB/MVTX stave production and
testing.
- TLH Collaboration meeting: Hotel reservations at a
negotiated rate is ended on Nov 16, 2018. Please register if
you plan to be at the meeting. Draft agenda will be
circulated on Monday and there will be 1-day pre-meeting
& 2-day post-meeting MVTX/tracking workfest.
- Talks: Volunteers are needed to give more talks at WWND
2018 (Colorado) and Santa Fe workshop (UCLA).
- Picture book: Picture book has been launched to help
those who give talks find information more easily. Approved
performance plots, photos and etc. are saved in master
keynote/pptx files on DropBox.
[Project update by Ed O'brien]
- Recent new/issues: TEC accounts for LLPs are open.
LLP-1 100k SiPM has been placed, Scintillating tile and
fiber LLPs next in the pipe. SAMPA v5 multi-project run has
been placed with help from SBU and USP. Cost for MVTX CERN
components set and paperwork for purchase has started at U
Tennessee.
- Project activities: Monthly statusing of each L2
started in Oct. Plan to practice EVMS starting Nov 2018.
Begin preparation for PD-2/3 scheduled for May 2019.
- TPC test beam analysis with small prototype shows good
resolution and work on full-size prototype continues. Costs
for 10 Felix 2.0 DAM boards estimated at $76k.
- Half of EMCal sector 0 blocks complete at UIUC.
Production of block shapes for high eta is progressing at
Fudan University.
- sPHENIX components starting with HCal are soon to
arrive at BNL. HCal scintillator tiles pre-production
started at Uniplast.
- Cal electronics orders placed/in process.
[ RHIC beam optimization for sPHENIX by John Haggerty ]
John showed results of initial studies done to find an
optimum crossing angle at which sPHENIX can operate with a
lower collision rate to mitigate high level pile up in TPC.
p2 The model to predict PHENIX BB rate at different
crossing angle and Mathematica notebook were provided by
Wolfram.
p3 Almost all luminosity will be within +-10 cm vertex
range at crossing of 3 mrad.
p4 The BB and ZDC rates taken for a store from Run16 AuAu
runs are in the ballpark of what the model predicts, i.e.
hundreds of kHz.
p5 The peak luminosity at zero crossing angle from Run 16
that RHIC Run 16 page reports is 155x1026 cm-2s-1, but note
that the model used is very simplified model.
p6 Vertex distributions tend to narrow as the crossing
angle increases.
p7 A typical luminosity plot from Run 16 was shown to
compare with the model prediction. The Zbbc (BBCLL1)
distribution in blue is comparable to the model prediction
of σ = 20 cm.
p8 At crossing angle of 3 mrad, most of luminosity will
be within +-10 cm vertex range. Fraction of luminosity
within +- 10 cm at crossing angle of 3 mrad w/r/t full
luminosity at zero crossing angle will drop to 0.25 (from
0.4 at zero crossing angle).
p9 The model is in reasonable agreement, so a crossing
angle of 3 rad will be optimum operation point for sPHENIX.
There are still questions that need to be answered such as
whether our detectors will fit with a beam crossing angle of
3 mrad.
TH: Is one beam at +3 mrad and the other at -3 mrad or is
it +- 1.5 mrad?
JH: It is at +- 1.5 mrad.
SB: There are measurement that can benefit from the whole
+-30 cm vertex such as photons, direct photons and jets.
Will we have a separate run with zero crossing angle to
provide data for calibrations?
JH: It will be hard and there may not be any great virtue
in having collisions outside the MVTX acceptance from a
tracking point of view.
DM: Without detailed information about materials for
support structure, events outside the vertex detector
acceptance will be hard to study. If you are looking at high
pT photon measurements you don't need tracking.
SB: There are also jets.
JH: There might be satellite peaks that the model does
not describe.
SB: I'd expect the satellite peaks will be suppressed at
3 mrad crossing angle. Is changing the beam crossing angle
hard from CAD point of view?
JH: As we have enough time to think about this, we can
come up with a way to make it not so hard and consult CAD.
[OSI update by Mickey]
- INTT-MVTX integration : 3D mock-up shows MVTX and 4
INTT layers can coexist.
- Racks are assigned. Will be 3 levels and contents are
being collected.
- Upper rack will hold cable trays. Cable organization is
being documented using ICD. MBD and INTT cable routing are
being worked out.
- General grounding concepts were explained and the
guidelines are documented in DocDB. sPHENIX will have a
separate clean ground. All subsystems are required to have a
documented grounding plan by Dec. collaboration meeting.
[NSF iHCAL proposal and MEPHI/Uniplast update]
- Visit to Uniplast generated a lot of confidence in their
technical expertise. Expect very high quality products.
- MEPHI visit went well and looking forward to getting them
involved in tile mapping using their cosmic ray air shower
detector, which will have an impact on understanding
systematic effects.
- NSF MRI is well on track.
On Fri, Nov 16, 2018 at 5:15 AM Gunther M Roland
<rolandg AT mit.edu>
wrote:
Friends,
We'll have the 60th General Meeting at noon today. The
agenda and connection info (also copied below) can be
found at
https://indico.bnl.gov/event/5349/
Cheers,
Gunther and Dave
>>>>
To join the Meeting:
https://bluejeans.com/913283451 To join via Browser:
https://bluejeans.com/913283451/browser To join with Lync:
https://bluejeans.com/913283451/lync To join via Cisco Jabber Video:
https://bluejeans.com/913283451/jabber To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 913283451 To join via phone : 1) Dial: +1.408.740.7256 +1.888.240.2560 +1.408.317.9253 (see all numbers -
http://bluejeans.com/numbers?ll=en) 2) Enter Conference ID : 913283451
sPHENIX-l mailing list sPHENIX-l AT lists.bnl.gov https://lists.bnl.gov/mailman/listinfo/sphenix-l _______________________________________________ sPHENIX-l mailing list sPHENIX-l AT lists.bnl.gov https://lists.bnl.gov/mailman/listinfo/sphenix-l |
-
[Sphenix-l] 60th sPHENIX General Meeting today,
Gunther M Roland, 11/16/2018
- Re: [Sphenix-l] 60th sPHENIX General Meeting today, Lajoie, John G [PHYSA], 11/16/2018
-
Re: [Sphenix-l] 60th sPHENIX General Meeting today,
sookhyun lee, 11/18/2018
- Re: [Sphenix-l] 60th sPHENIX General Meeting today, EdwardOBrien, 11/19/2018
Archive powered by MHonArc 2.6.24.