sphenix-l AT lists.bnl.gov
Subject: sPHENIX is a new detector at RHIC.
List archive
- From: Itaru Nakagawa <itaru AT bnl.gov>
- To: sphenix-l AT lists.bnl.gov
- Subject: Re: [Sphenix-l] Initial Stages Talk
- Date: Thu, 27 Jun 2019 13:11:00 +0900
Hi Rosi,
Nice slides. Please use attached photo as the INTT telescope used for the beam test if you can.
-itaru
On 2019/06/26 14:01, Rosi Reed wrote:
Hi Everyone,
Thanks to everyone for comments/pictures. The latest draft can be found at:
https://indico.bnl.gov/event/5391/contributions/29260/attachments/23530/34060/RReedISPHENIX2019v2.pdf
Any additional comments should be made before 430 EST.
Cheers,
Rosi
On Tue, Jun 25, 2019 at 4:16 PM Huang, Jin <jhuang AT bnl.gov> wrote:
Hi Rosi
Nice slides!
A quick comment on slide 14, we could also add the TPC test beam which just completed last week
(https://urldefense.proofpoint.com/v2/url?u=https-3A__photos.app.goo.gl_pqmdXYcE3iBg8mFC8&d=DwIFaQ&c=aTOVZmpUfPKZuaG9NO7J7Mh6imZbfhL47t9CpZ-pCOw&r=lu0kHEdD8jtg27x_W4cXhZTEE_SX42u5KNwDalzVu0I&m=SXfaQg9qkjbMvfPgyX_Xi8YdveDiJ05Vv50iRqkMPfY&s=QCd9bC8DdYFUcaq8pRgNiyivxmr7XBEnIBh5CDobhcE&e=
). The description under TPC could be
Beam tests of TPC prototype with sPHENIX R2 quard-GEM module
Successful data taking last week with the near final sPHENIX TPC electronics
Alternatively, a photo for all three tracking detector prototypes on the
Fermilab Test Beam Facility beamline are attached.
Cheers
Jin
______________________________
Jin HUANG
Associate Physicist
Brookhaven National Laboratory
Physics Department, Bldg 510 C
Upton, NY 11973-5000
Office: 631-344-5898
Cell: 757-604-9946
______________________________
-----Original Message-----
From: sPHENIX-l <sphenix-l-bounces AT lists.bnl.gov> On Behalf Of Rosi Reed
Sent: Tuesday, June 25, 2019 4:00 PM
To: Sphenix-l AT lists.bnl.gov
Subject: [Sphenix-l] Initial Stages Talk
Hello sPHENIX,
My talk at Initial Stages is tomorrow afternoon, I would appreciate any
comments to the attached draft!
https://urldefense.proofpoint.com/v2/url?u=https-3A__www.dropbox.com_s_8huc5usef2n9uh6_RReedISPHENIX2019v1.pdf-3Fdl-3D0&d=DwIBaQ&c=aTOVZmpUfPKZuaG9NO7J7Mh6imZbfhL47t9CpZ-pCOw&r=lu0kHEdD8jtg27x_W4cXhZTEE_SX42u5KNwDalzVu0I&m=iV07pJXXCpN9WfnV4cArhOEQTfbK--vssTvrec9MbCY&s=IJiGNbt2JpAxO3wIO4IskS34T5OeDza9484EYYxmmRU&e=
It is a little long for 15+5, but there are a lot of pictures. I may cut a
little after practice tonight.
Regards,
Rosi
--
Rosi Reed
RHIC/AGS UEC Outgoing Chair
Assistant Professor, Physics Department
Lehigh University
(610)758-3907
16 Memorial Drive East Office 406
Bethlehem, PA 18015
she/her/hers
_______________________________________________
sPHENIX-l mailing list
sPHENIX-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/sphenix-l
Attachment:
INTT_Telescope.jpg
Description: JPEG image
-
[Sphenix-l] Initial Stages Talk,
Rosi Reed, 06/25/2019
-
Re: [Sphenix-l] Initial Stages Talk,
Huang, Jin, 06/25/2019
-
Re: [Sphenix-l] Initial Stages Talk,
Rosi Reed, 06/26/2019
-
Re: [Sphenix-l] Initial Stages Talk,
Itaru Nakagawa, 06/27/2019
- Re: [Sphenix-l] Initial Stages Talk, Itaru Nakagawa, 06/27/2019
-
Re: [Sphenix-l] Initial Stages Talk,
Itaru Nakagawa, 06/27/2019
-
Re: [Sphenix-l] Initial Stages Talk,
Rosi Reed, 06/26/2019
-
Re: [Sphenix-l] Initial Stages Talk,
Huang, Jin, 06/25/2019
Archive powered by MHonArc 2.6.24.