sphenix-l AT lists.bnl.gov
Subject: sPHENIX is a new detector at RHIC.
List archive
- From: Barbara Jacak <bvjacak AT lbl.gov>
- To: "Edward O'Brien" <eobrien AT bnl.gov>
- Cc: "Pontieri, Chris" <cpontieri AT bnl.gov>, "Vasquez, Joel" <jvasquez AT bnl.gov>, Mariette Faulkner <faulkner AT bnl.gov>, "La Bounty, James" <labounty AT bnl.gov>, "Boose, Stephen" <boose AT bnl.gov>, "Hamblen, Peter \(CONTR\)" <phamblen AT bnl.gov>, shana Prifte <sprifte AT bnl.gov>, Al Borrelli <borrelli AT bnl.gov>, Sal Polizzo <sapolizzo AT bnl.gov>, Aaron Allen <allena AT bnl.gov>, "mills, James A" <mills AT bnl.gov>, Chris Cordovano <ccordovan AT bnl.gov>, "Lenz, Michael D" <mlenz AT bnl.gov>, Bill Lenz <wlenz AT bnl.gov>, Carter Biggs <biggs AT bnl.gov>, Richard Ruggiero <ruggiero AT bnl.gov>, "sphenix-l AT lists.bnl.gov" <sphenix-l AT lists.bnl.gov>, Irina Sourikova <irina AT rcf.rhic.bnl.gov>, Frank Toldo <fatoldo AT bnl.gov>, Dan Cacace <dcacace AT bnl.gov>
- Subject: Re: [Sphenix-l] And Thats How its Done !
- Date: Sat, 11 Sep 2021 14:34:12 -0700
Wow!
with best wishes to all,
Barbara
On Sat, Sep 11, 2021 at 5:14 AM Edward O'Brien via sPHENIX-l <sphenix-l AT lists.bnl.gov> wrote:
Hi all,
I thought that the collaboration would be interested in seeing
these photos taken by Frank Toldo on Wednesday. OHCal Sectors
1-13 are installed. Now we switch gears and install the
SC- Magnet. We should have the magnet installed before the
end of September.
And for those wondering about photo #3. Yes that is Aaron flying.
Our team has special abilities.
Thanks.
Ed
_______________________________________________
sPHENIX-l mailing list
sPHENIX-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/sphenix-l
-
[Sphenix-l] And Thats How its Done !,
Edward O'Brien, 09/10/2021
- Re: [Sphenix-l] And Thats How its Done !, Greene, Senta V, 09/11/2021
- Re: [Sphenix-l] And Thats How its Done !, Barbara Jacak, 09/11/2021
- Re: [Sphenix-l] And Thats How its Done !, Kistenev, Edouard, 09/12/2021
Archive powered by MHonArc 2.6.24.