Hi Rachid and all,

Beautiful, thanks for the photos, congratulations!

 

Send us more photos after the ROC/cable installation, we are very interested in knowing the surroundings for the MVTX insertion work.

 

Cheers,

Ming  

 

-----

signature_61897647

 

Dr. Ming Xiong Liu

P-3, MS H846

Physics Division

 

Office: 505.667.7125

Mobile: 505.412.7396

Los Alamos National Laboratory

 

 

From: sPHENIX-l <sphenix-l-bounces AT lists.bnl.gov> on behalf of nouicer via sPHENIX-l <sphenix-l AT lists.bnl.gov>
Reply-To: nouicer <rachid.nouicer AT bnl.gov>
Date: Wednesday, March 1, 2023 at 3:17 PM
Cc: "sphenix-l AT lists.bnl.gov" <sphenix-l AT lists.bnl.gov>
Subject: [Sphenix-l] The INTT detector is installed in the sPHENIX experiment

 

Dear All,

Yes Glenn, as we promised we deliver; it can be removed from the schedule.

See a few attached pictures.

Today, the INTT detector was installed in its final position in the sPHENIX experiment at 1008. 
As soon we install the readout cards (ROCs), we will proceed with the commissioning.

Many thanks to the sPHENIX technicians and engineers for their tremendous support.  

Sincerely 
Rachid for the INTT group.



On 3/1/23 8:22 AM, Glenn Young wrote:

Dear Rachid,
Congratulations to you and your crew.
We all look forward to more good news from you on Wednesday.

Regards, Glenn

 

On Wed, Mar 1, 2023 at 8:08 AM Edward O'Brien via sPHENIX-l <sphenix-l AT lists.bnl.gov> wrote:

    Hi Rachid,
     That's good news. Quite an accomplishment at the end of
    a very long day. Congratulations to all, and I can't wait to see the INTT
    rolled-in tomorrow. Thanks for the update.

    Ed

On 2/28/23 10:12 PM, nouicer wrote:

Dear All, 
 
A quick update, we just finished closing successfully the two INTT detector halves around the aluminum beam pipe at the sPHENIX IR. 
The aluminum guides between the INTT detector and the CFC tube inside TPC were installed and making INTT ready to be rolled inside the TPC and around the beryllium beam.
The beam pipe sensor probes for monitoring, the plots were very stable, and no indication of any type of vibration. 

Tasks for tomorrow morning (after the daily meeting at 8:30 am):

1- installed beam support 

2- roll in the INTT inside the TPC and around the beryllium beam pipe. 

Many people contributed, and it is very hard to mention all the names.
Many thanks to the sPHENIX, and CAD technicians and engineers; the way you handled the INTT detector installation showed resilience, experience, knowledge, and critical thinking. 

Special thanks to Dan Cacace, Robert Pisani, Nick Seberg, and James LaBounty, they did not give up, and you were amazing.

Important note: As Frank Toldo requested, the north side was posted with yellow tape. People should not go to the north-side scaffolding.  

Thank you all.
 
Sincerely, 
Rachid for the INTT group 

-- 
/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/
                                                 /                     /
 Rachid Nouicer                                 /                     /
 Brookhaven National Laboratory                /                     /
                                              /                     /
 Address:                                    /                     /
 Brookhaven National Laboratory (BNL)       /                     /
 Physics Department, Building 510c         /                     /
 20 Pennsylvania Avenue                   /                     /
 Upton, New York, 11973, U.S.A.          /Phone:+1 631 344 8433/
                                        /                     /
 E-mail : rachid.nouicer AT bnl.gov       / Fax:+1 631 344 3253 /
 Web:http://www4.rcf.bnl.gov/~nouicer /                     /
                                     /                     /
/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/ 

 

_______________________________________________
sPHENIX-l mailing list
sPHENIX-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/sphenix-l

-- 
/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/
                                                 /                     /
 Rachid Nouicer                                 /                     /
 Brookhaven National Laboratory                /                     /
                                              /                     /
 Address:                                    /                     /
 Brookhaven National Laboratory (BNL)       /                     /
 Physics Department, Building 510c         /                     /
 20 Pennsylvania Avenue                   /                     /
 Upton, New York, 11973, U.S.A.          /Phone:+1 631 344 8433/
                                        /                     /
 E-mail : rachid.nouicer AT bnl.gov       / Fax:+1 631 344 3253 /
 Web:http://www4.rcf.bnl.gov/~nouicer /                     /
                                     /                     /
/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/ 

_______________________________________________ sPHENIX-l mailing list sPHENIX-l AT lists.bnl.gov https://lists.bnl.gov/mailman/listinfo/sphenix-l




Archive powered by MHonArc 2.6.24.

Top of Page