Hi all,
We made very good strides this week toward
readiness for Run 2023. Water is now running to
26/27 racks on the sPHENIX carriage. The final rack
w/o water is an MVTX rack that will get plumbed in next week.
Also we have completed the water and gas runs for the
EMCal, TPC and TPOT. We still need to install the INTT water
distribution panel and plumb it to the detector, as well as plumb
the MVTX once it is installed. MVTX installation is scheduled to begin
3/27. The INTT cabling is going well. Thanks.
Ed