Hi all,
As many of you know, the sPHENIX Internal Readiness
Review was held last week, Apr 5-7. Though the review
focused on safety, much of it also concentrated on documentation,
such as assembly drawings, procedures, training, detector
test results, operations planning etc. We posted > 200 documents
on the IRR website.
https://brookhavenlab.sharepoint.com/sites/IRRforsPHENIX?market=en-US
The review outcome was positive though we were left with 11 pre and post
start action items to address. See attached.
In order to have permission to cool down our magnet, and flow operating
gas to the TPC and TPOT, we need to address the action items
in the review report. Though that sounds easy, we have to provide
a written response to each item that we have addressed, and have 4 separate
groups approve our responses: the IRR committee, the CAD Experimental Safety
Review Committee, BNL ES&H, and the local DOE office (in series).
Both the sPHENIX group, and CAD, are working on these responses and we
hope to submit them to the groups for review and approval soon. Thanks.
Ed
Attachment:
Summary of Action Items from the sPHENIX Internal Readiness Review.docx
Description: application/vnd.openxmlformats-officedocument.wordprocessingml.document
- [Sphenix-l] Outcome of recent sPHENIX Internal Readiness Review, Edward O'Brien, 04/11/2023
Archive powered by MHonArc 2.6.24.