sphenix-l - [Sphenix-l] after approval ---> 8 am on May 19 to adjust nitrogen flow meter in IR and start to cool down the sPHENIX magnet

sphenix-l AT lists.bnl.gov

Subject: sPHENIX is a new detector at RHIC.

List archive

Chronological Thread  
  • From: "Yip, Kin" <kinyip AT bnl.gov>
  • To: "sphenix-l AT lists.bnl.gov" <sphenix-l AT lists.bnl.gov>
  • Cc: "sphenix-run-l AT lists.bnl.gov" <sphenix-run-l AT lists.bnl.gov>
  • Subject: [Sphenix-l] after approval ---> 8 am on May 19 to adjust nitrogen flow meter in IR and start to cool down the sPHENIX magnet
  • Date: Thu, 18 May 2023 22:18:47 +0000

Hi,

It's good that this morning, we already talked with the C-AD Cryo group, our gas expert Rob Pisani, and Paul Sampson (C-AD maintenance/operation coordinator) in preparation for the arrival of this approval (email below --- without the original letter).   The Cryo group actually needs to open a few valves before they can cool down our Magnet and one of the valves is on the RHIC berm behind Bldg. 1008B inside the fence which is locked.  That's, they also need "no beam" in order to open that valve (with some additional works).

After this approval message, I have confirmed with them and we agreed on the time of 8 am tomorrow(May 19) for the "access" (no beam).  So, Rob and our technicians can adjust nitrogen flow meters inside the 1008-IR.   ( A few more sPHENIX colleagues will also go inside the IR. )  In fact, as Rob reminded me, I've checked with M. Sardzinski (C-AD Cryo group) to make sure that the LN2 dewar on the 1008 gas pad is operational tomorrow at 8 am.  

Rob told me this afternoon  that he'll try to flow the operational gas to TPOT as well tomorrow as TPOT has relatively smaller volume and we have flown argon (from time to time) for a little while already.  We need to wait a day or two before flowing the operational gas to TPC.

The C-AD Cryo group is busy with some works at 2 o'clock of RHIC today/this evening.  But they'll do the necessary at 8 am tomorrow to start our Magnet cool-down.  Since this is only the 2nd time, the Cryo Chief Engineer Roberto Than will need to work with the Cryo Control Room for quite a bit initially.

STAR and other C-AD groups will also make use of this "access" time, as Paul Sampson will help coordinate.

Kin



-------- Forwarded Message --------
Subject: APPROVAL FOR ROUTINE OPERATIONS OF THE sPHENIX DETECTOR
Date: Thu, 18 May 2023 20:14:59 +0000
From: Hemmerly, Monique CONTR <Monique.Hemmerly AT Science.doe.gov>
To: Gao, Haiyan <hgao AT bnl.gov>
CC: Serra, Joanna <Joanna.Serra AT science.doe.gov>, Lukes, Robert <Robert.Lukes AT science.doe.gov>, Olson, Gary BHSO <Gary.Olson AT science.doe.gov>, Tabone, Sean M BHSO <Sean.Tabone AT science.doe.gov>, Sullivan, Patrick BHSO <Patrick.Sullivan AT science.doe.gov>, Cracco, Joseph BHSO <Joseph.Cracco AT science.doe.gov>, Seniuk, Chris BHSO <Chris.Seniuk AT science.doe.gov>, Anderson, Jack (SC-BNL) <janderson AT bnl.gov>, Chamizo Llatas, Maria <mchamizo AT bnl.gov>, 'Daniels, Thomas' <tdaniels AT bnl.gov>, Fischer, Wolfram <wfischer AT bnl.gov>, Fliller, Raymond <rfliller AT bnl.gov>, cgaldamez AT bnl.gov <cgaldamez AT bnl.gov>, Hammons, Lee <hammons AT bnl.gov>, Minty, Michiko <minty AT bnl.gov>, Morrison, David <morrison AT bnl.gov>, O'Brien, Edward <eobrien AT bnl.gov>, rolandg AT mit.edu <rolandg AT mit.edu>, Tribble, Robert <rtribble AT bnl.gov>, Yip, Kin <kinyip AT bnl.gov>


Good Afternoon Dr. Gao,

 

On behalf of Bob Gordon, attached please find the subject letter. If you have any questions, please contact Sean Tabone at ext. 3988 or via email at Sean.Tabone AT science.doe.gov.

 

Have a great day & stay safe!

 

Warm Regards,

Monique Hemmerly

Reporting Specialist III

Contractor, Chickasaw Management Services, LLC

In Support of:

The U.S. Department of Energy

Brookhaven Site Office

53 Bell Ave. Building 464

Upton, New York 11973

Phone: (631) 344-3431

Email: Monique.Hemmerly AT science.doe.gov

 

 

 



  • [Sphenix-l] after approval ---> 8 am on May 19 to adjust nitrogen flow meter in IR and start to cool down the sPHENIX magnet, Yip, Kin, 05/18/2023

Archive powered by MHonArc 2.6.24.

Top of Page