Skip to Content.
Sympa Menu

sphenix-l - [Sphenix-l] Now open: added DAQ Operator shifts May 30 to June 27

sphenix-l AT lists.bnl.gov

Subject: sPHENIX is a new detector at RHIC.

List archive

Chronological Thread  
  • From: Stefan Bathe <stefan.bathe AT baruch.cuny.edu>
  • To: sphenix-run-l AT lists.bnl.gov, sphenix-l AT lists.bnl.gov
  • Subject: [Sphenix-l] Now open: added DAQ Operator shifts May 30 to June 27
  • Date: Thu, 25 May 2023 23:21:47 -0400

Dear All,

After starting our commissioning with two-person watch shifts only (Shift Leader, Detector Operator), we now feel that we have reached the point where we both (i) will benefit from having a dedicated DAQ Operator on shift and (ii) the DAQ may be in a stable enough place that it can be transitioned from expert operation to shift operation.

Therefore we have just opened DAQ Operator shifts from May 30 to June 27 to bridge the gap between two-person watch shifts and full four-person regular shift operation.

We realize this is very short notice.—The shift training will be on Monday—Memorial Day.  So we might not be able to fill all positions.  If you are able to help out, the most important position to be filled is the overnight shift, when few experts are around, followed by the evening shift.

Best regards,
Stefan

---------------------------------------------------------------------------------
Stefan Bathe
Professor of Physics
Baruch College, CUNY
and RIKEN Visiting Scientist

Baruch:                                     BNL:
17 Lexington Ave                      Bldg. 510
office 940                                  office 2-229
phone 646-660-6272                phone 631-344-8490
----------------------------------------------------------------------------------






Archive powered by MHonArc 2.6.24.

Top of Page