BRAVO!! This is great news as you can imagine. Look forward (sigh) to removing the MVTX detector on the South side during the week of December 4th. Hopefully this success will continue on he repair of the TPC – both on the NORTH and the SOUTH. Have a great Thanksgiving! Walter
From: sPHENIX-l <sphenix-l-bounces AT lists.bnl.gov>
On Behalf Of Yip, Kin via sPHENIX-l
Hello,
Thia evening, I can cheerfully report that the long-awaited "white smoke" has materialized (after preparing for two full days .... Well, we started turning on normal flow for TPC gas last Thursday).
This afternoon/evening, I spent some time in 1008 room observing the TPC group (Tom, Charles, Evgeny and Luke) , John H., Martin, and Dan Cacace, completing the TPC test successfully.
Under Tom's and John's leadership, we have tried to do the most comprehensive TPC test (using the CAEN power supply and the long bundle of cables) that we can do in a very timely manner. At the end of the test, we saw tracks successfully in the two sectors (611 & 612) in the North side of TPC in which we have installed the new equipment (along with other sectors). One of these two sectors was pathologically bad before the repair/upgrade whereas the other sector had no defect.
We have demanded this test to convince ourselves that the TPC repair/upgrade scheme works and so we can start to prepare for the same TPC repair/upgrade for the entire TPC including both the North and South sides).
Now, we have reached this point and we will start to prepare for the South tomorrow (Nov. 22), which would (at some point soon) include taking out the MVTX.
Kin Yip
PS:
During the few hours in 1008, I also copied the "2023" files to the "2024" directory and we now have the "2024 run page" :
Of course, I have changed only the "2023" to "2024" and the name of Run Coordinator on the above page. Everything else has to be updated ...😅 |
-
[Sphenix-l] "White smoke" (TPC test succeeded) → prep. for the South starts tomorrow,
Yip, Kin, 11/21/2023
- Re: [Sphenix-l] "White smoke" (TPC test succeeded) → prep. for the South starts tomorrow, Liu, Ming Xiong, 11/21/2023
- Re: [Sphenix-l] "White smoke" (TPC test succeeded) → prep. for the South starts tomorrow, Gunther M Roland, 11/21/2023
- Re: [Sphenix-l] "White smoke" (TPC test succeeded) → prep. for the South starts tomorrow, W.A. Zajc, 11/22/2023
- Re: [Sphenix-l] [Sphenix-run-l] "White smoke" (TPC test succeeded) → prep. for the South starts tomorrow, David Morrison, 11/22/2023
- Re: [Sphenix-l] "White smoke" (TPC test succeeded) → prep. for the South starts tomorrow, Sondheim, Walter E, 11/22/2023
- Re: [Sphenix-l] [Sphenix-run-l] "White smoke" (TPC test succeeded) → prep. for the South starts tomorrow, Edward O'Brien, 11/22/2023
- Re: [Sphenix-l] "White smoke" (TPC test succeeded) → prep. for the South starts tomorrow, Soltz, Ron, 11/22/2023
Archive powered by MHonArc 2.6.24.