sphenix-magnet-l - [Sphenix-magnet-l] Magnet meeting 2014.10.01

sphenix-magnet-l AT lists.bnl.gov

Subject: sPHENIX discussion of the superconducting solenoid

List archive

Chronological Thread  
  • From: John Haggerty <haggerty AT bnl.gov>
  • To: sphenix-magnet-l AT lists.bnl.gov
  • Subject: [Sphenix-magnet-l] Magnet meeting 2014.10.01
  • Date: Thu, 02 Oct 2014 15:06:08 -0400

Sorry again for the confusion about the meeting time, I've put on my calendar a note to send a reminder the Monday before a meeting.

Paul told us that the thermal shield tools were delayed in the shops but are being boxed to be sent to SLAC now; they should be there by early next week. If everything goes smoothly from here, the valve box and solenoid could be shipped on Oct 13 or 20. I think Mike said that the contract for the rest of the equipment (which can be shipped by conventional means) is not placed; we'll want some of that in early 2015 so the next order of business for shipping is to get that here.

Mike showed some slides that show the schedule and budget for bringing the magnet here, constructing and installing a modified chimney in building 912, and performing a lower power test of the system.

We discussed at some length the advantages and disadvantages of testing with the original chimney first, and then changing to the sPHENIX compatible chimney. We would like to fit the low power test into a period of time which is likely to end around June or July 2015 when the cryo plant in 912 is not needed for the ERL due to repairs on the gun. Right now, we think Paul has completed 90% of the design is done for the "final" chimney, and we have a good chance of doing the initial tests with that, which would save time and money over testing twice. Don will check on the lengths of the new horizontal extension of the chimney to make sure it's compatible with all the variations of the sPHENIX HCAL that we are considering.

Dave showed a new drawing of the 912 floor taking into account the longer chimney extension. We discussed building a support structure for the chimney; probably this will have to be done by CAD, since it will be reviewed and inspected in CAD space.

Bob Lambiase confirmed that we have a power supply appropriate for the low power test. We do not believe quench protection will be necessary for the test. The cryostat does not have an ASME stamp (as far as we can tell), and so will have to be certified for ASME equivalency (I think I got the terminology correct). [After the meeting, it occurred to me that we might want to use the test to test the instrumentation, like the temperature sensors and strain gauges, so we probably do need some PLC work.]

Mike will present the plans for moving and testing the magnet at the sPHENIX Project Management Group (PMG) meeting next Tuesday, October 7 in the Orange Room in Physics. Roberto will make a few slides showing the testing schedule and costs.

Next magnet meeting: Wed Oct 15 1pm at SMD.

--
John Haggerty
email: haggerty AT bnl.gov
cell: 631 741 3358