Subject: sPHENIX discussion of the superconducting solenoid
List archive
Re: [Sphenix-magnet-l] draft of the magnet slides for the cost and schedule review parallel session
- From: Achim Franz <afranz AT bnl.gov>
- To: "Makdisi, Yousef I" <makdisi AT bnl.gov>
- Cc: "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>
- Subject: Re: [Sphenix-magnet-l] draft of the magnet slides for the cost and schedule review parallel session
- Date: Fri, 30 Oct 2015 11:32:09 -0400
Yousef,
thanks
about the ANSYS, weren't mechanical forces during cool-down studied so far, but not the mechanical plus magnetic ones ?
The shield wall comes from previous AGS projects, doesn’t it ?
The plots for the magnet position in 912 came from Dave, so I assume these are the latest ones.
I check on the cost with Jim, he mentioned some in his talk.
Achim
On Oct 30, 2015, at 10:47 , Makdisi, Yousef I <makdisi AT bnl.gov> wrote:Hello Achim,
A quick look at the presentation and some comments:
Page 2, the review bullet please take out the time and US/Eastern…..)Page 6 tabs>>> taps
Do you want to mention the ANSYS calculations already done?It would be nice to list what we will learn from the low 100 amp test.
Page 16: What is the temporary shield wall from previous AGS project?Page 16: I assume you will note the pole tips are not shown in the diagram.
Page 17: I must be missing something as I see the location has changed. D. Phiilps: is it agreed to remove the block house which I note is not shown on the low field diagram either.
I know J. Mills notes the 912 activities are “off project” but do you have cost estimates should someone ask?After all, they is a cost and schedule review!
Regards,Yousef
From: <sphenix-magnet-l-bounces AT lists.bnl.gov> on behalf of Achim Franz <afranz AT bnl.gov>
Date: Wednesday, October 28, 2015 at 11:30 AM
To: "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>
Subject: [Sphenix-magnet-l] draft of the magnet slides for the cost and schedule review parallel session
Hello,
here is the current draft of my slides for the cost and schedule review parallel session. We have a dress rehearsal on Thursday when I suppose to post the talk for review.
Thanks
Achim
_______________________________________________
Sphenix-magnet-l mailing list
Sphenix-magnet-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/sphenix-magnet-l
-
[Sphenix-magnet-l] draft of the magnet slides for the cost and schedule review parallel session,
Achim Franz, 10/28/2015
-
Re: [Sphenix-magnet-l] draft of the magnet slides for the cost and schedule review parallel session,
Makdisi, Yousef I, 10/30/2015
- Re: [Sphenix-magnet-l] draft of the magnet slides for the cost and schedule review parallel session, Achim Franz, 10/30/2015
-
Re: [Sphenix-magnet-l] draft of the magnet slides for the cost and schedule review parallel session,
Makdisi, Yousef I, 10/30/2015
Archive powered by MHonArc 2.6.24.