sphenix-magnet-l AT lists.bnl.gov
Subject: sPHENIX discussion of the superconducting solenoid
List archive
Re: [Sphenix-magnet-l] SPhenix leads clamped .... ERL solenoid replacement postponed
- From: "Yip, Kin" <kinyip AT bnl.gov>
- To: "Ceruti, Raymond B" <rayc AT bnl.gov>
- Cc: "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>
- Subject: Re: [Sphenix-magnet-l] SPhenix leads clamped .... ERL solenoid replacement postponed
- Date: Tue, 10 Nov 2015 22:54:38 +0000
Hi Ray, Thanks a lot ! I guess since you don't mention any issue. The leak check this time has been a success ?! Could you please confirm ? I cc: to the sphenix-magnet mailing list. Also, what's written below is a new schedule from the ERL notification system and the solenoid replacement seems to be postponed to Nov. 30, which makes our field-joint schedule a bit relaxed ... ======================_==_=_==== Per Ilan’s direction, we will move to cathode stalk conditioning as soon as possible.
a) Conditioning on Thursday (11/12) ; HOM measurement on Friday (11/13)
b) Cathode stalk insertion and conditioning: next
Monday (11/16) to 11/25.
c) 11/30 to 12/11: (1) Two weeks for DCCT shielding and Solenoid installation (is this possible for vacuum resource); (2) Cathode deposition; (3) sPHINEX test;
d) Beam test on 12/14===============================
Sent from my Verizon 4G LTE Smartphone
------ Original message------ From: Ceruti, Raymond B Date: Wed, Nov 11, 2015 05:08 To: Yip, Kin; Cc: Anerella, Michael D;Wanderer, Peter;Kovach, Paul E; Subject:SPhenix leads clamped.
Hi All, Today we pressurized the helium system, sniffed leak tested the new joints, applied lead clamps, attached the voltage tap connection board, and insulated the exposed tubes in the triangle box. Regards, Ray
|
Attachment:
IMG_20151110_145914232.jpg
Description: IMG_20151110_145914232.jpg
Attachment:
IMG_20151110_143113271.jpg
Description: IMG_20151110_143113271.jpg
Attachment:
IMG_20151110_143135584.jpg
Description: IMG_20151110_143135584.jpg
- Re: [Sphenix-magnet-l] SPhenix leads clamped .... ERL solenoid replacement postponed, Yip, Kin, 11/10/2015
Archive powered by MHonArc 2.6.24.