Summary of sPHENIX Magnet Meeting from 11/12/15:
Ray Ceruti reported: - Valve Box is attached to the Magnet. - He lines from Valve Box to Magnet are connected. - 50 psi He leak check was completed for connections. - It is believed that the Magnet was previously purged with He, causing a high background which prevents leak checking with He (who did this?). - Electrical leads are electrically isolated from the cooling lines by two layers of 5 mil kapton. - Hy-pot test needs to be done (traveler is ready). - Ray needs location of temperature sensors. - All Dog House wire connections need to be completed. - New V-Tap Board is mounted, needs to be wired. - Dog House Heat Shield need to be reviewed (P. Kovach/ M. Anerella).
Roberto Than reported: - Warm piping will start soon. - Cryo Group will do the vacuum pump hook-up. - Roughing pumps will be located on the Valve Box Platform.
David Phillips Building 911B Upton, NY 11973 631-344-4671, Fax 631-344-5954, Cell 631-804-9477
|
- [Sphenix-magnet-l] sPHENIX Mag Meeting 11/12/15 Summary, Phillips, David B, 11/16/2015
Archive powered by MHonArc 2.6.24.