sphenix-magnet-l AT lists.bnl.gov
Subject: sPHENIX discussion of the superconducting solenoid
List archive
- [Sphenix-magnet-l] no change in L at 100% current or 50% or 10%, Kin Yip, 04/03/2017
- [Sphenix-magnet-l] ASSRC/ESRC (safety review) in ~ June, Kin Yip, 04/04/2017
- [Sphenix-magnet-l] voltage tap layout, Return steel pictures ... half-rack ?, Yip, Kin, 04/04/2017
- [Sphenix-magnet-l] Anybody has taken the half-rack/stand with the J10/J11/J12 connectors, Kin Yip, 04/05/2017
- [Sphenix-magnet-l] Frank Toldo to take those J4/J5 and voltage-tap cables ..., Yip, Kin, 04/06/2017
- [Sphenix-magnet-l] voltage tap cables unusuable as they've been under a shielding block), Kin Yip, 04/07/2017
- [Sphenix-magnet-l] Reminder for the sPHENIX Magnet biweekly meeting at 1:30 pm (Wed., Apr. 12, 2017), Yip, Kin, 04/12/2017
- [Sphenix-magnet-l] Brief Summary of today's sPHENIX Magnet biweekly meeting (Apr. 12, 2017) at 902A conference room, Yip, Kin, 04/12/2017
- [Sphenix-magnet-l] reflecting the real temperature sensor codes of the Cryo group, Kin Yip, 04/25/2017
- [Sphenix-magnet-l] Reminder for the sPHENIX Magnet biweekly meeting at 1:30 pm today (Wed., Apr. 26, 2017) at the 902A conf. room, Yip, Kin, 04/26/2017
- [Sphenix-magnet-l] A => +ve, Yip, Kin, 04/26/2017
- [Sphenix-magnet-l] Brief Summary of sPHENIX biweekly meeting on Apr. 26, 2017 at 902 conf. room, Yip, Kin, 04/26/2017
- [Sphenix-magnet-l] FW: Cold bar plumbing, Yip, Kin, 04/28/2017
Archive powered by MHonArc 2.6.24.