sphenix-magnet-l - [Sphenix-magnet-l] Sonny and Joe have taken the half-rack ... waiting for the survey result ... carpenter putting up the railing

sphenix-magnet-l AT lists.bnl.gov

Subject: sPHENIX discussion of the superconducting solenoid

List archive

Chronological Thread  
  • From: "Yip, Kin" <kinyip AT bnl.gov>
  • To: "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>
  • Subject: [Sphenix-magnet-l] Sonny and Joe have taken the half-rack ... waiting for the survey result ... carpenter putting up the railing
  • Date: Mon, 10 Jul 2017 15:49:47 +0000

Hi,

 

45 minutes ago or so, I showed Sonny Simaiuta and Joe Dambra where the half-rack was in Bldg. 912.  They have taken it to Superconducting Magnet

Division to make small modification.

 

I’ve just taken another picture this morning around the Magnet/steel box :

https://collab.external.bnl.gov/sites/sPHENIX-Magnet/Pictures/High%20Field%20Test/Return%20Yoke%20Construction/2017-7-10.jpg

 

Apparently, the survey was taken late last Friday after the magnet was slightly rotated.  Now, we’re waiting for the survey group to analyze

the data.  Matt (who has been doing the analysis)  is out today and Frank Karl is trying to see whether he can do the analysis   or   they have to wait

for Matt to come back tomorrow.

 

Richard Meier was moving his cables.   I also saw that a carpenter was installing the railing for the platform (all in Aluminium) in the Lead-End.  

So, the schedule  that D. Phillips sent last Friday (below) seems to be materializing (though Dave is not here today).  Hopefully, the riggers and Ray Ceruti’s group can install the Extension this Wed.

 

Kin

 

 

From: Phillips, David B
Sent: Friday, July 07, 2017 11:45 AM
To: Ceruti, Raymond B <rayc AT bnl.gov>; Yip, Kin <kinyip AT bnl.gov>; Mills, James A <mills AT bnl.gov>; Hock, Jonathan <jhock AT bnl.gov>; Streckenbach, Brian <bstreckenbach AT bnl.gov>
Cc: Kobasiuk, Frederick D <kobasiuk AT bnl.gov>; Folz, Charles <cfolz AT bnl.gov>; Anerella, Michael D <mda AT bnl.gov>; Karl, Francis X <karl AT bnl.gov>; Ilardo, Matthew <milardo AT bnl.gov>
Subject: sPHENIX Magnet plan for next week

 

sPHENIX Magnet plan for next week:

 

Friday 7/7 – Riggers place cryostat in correct position

Friday 7/7-Monday 7/10 – Survey confirms cryostat is correctly positioned

Monday 7/10-Tuesday 7/11 – Carpenters install handrails and access ladder to internal Lead End platform.

Wednesday 7/12 – Riggers and Magnet Division install Valve Box Extension

Monday 7/10 - until completed – Drilling/taping holes in return steel

Thursday 7/13 – until completed  - Riggers install return steel (this needs to be coordinated with MD Teck’s working on Dog House connections)

 

Week of 7/17:

-          MD Teck’s continue with Dog House connections

-          Riggers install Return Steel and shield blocks for Valve Box Platform

-          Carpenters assemble scaffolding for access to External Dog House

-          Carpenters install handrails etc for Valve Box Platform

 

 

David Phillips

Building 911B

Upton, NY 11973

631-344-4671, Fax 631-344-5954, Cell 631-804-9477

On site pager 344-3456 then 4267 then your number

 