sphenix-magnet-l AT lists.bnl.gov
Subject: sPHENIX discussion of the superconducting solenoid
List archive
[Sphenix-magnet-l] Sonny and Joe have taken the half-rack ... waiting for the survey result ... carpenter putting up the railing
- From: "Yip, Kin" <kinyip AT bnl.gov>
- To: "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>
- Subject: [Sphenix-magnet-l] Sonny and Joe have taken the half-rack ... waiting for the survey result ... carpenter putting up the railing
- Date: Mon, 10 Jul 2017 15:49:47 +0000
Hi,
45 minutes ago or so, I showed Sonny Simaiuta and Joe Dambra where the half-rack was in Bldg. 912. They have taken it to Superconducting Magnet Division to make small modification.
I’ve just taken another picture this morning around the Magnet/steel box :
Apparently, the survey was taken late last Friday after the magnet was slightly rotated. Now, we’re waiting for the survey group to analyze the data. Matt (who has been doing the analysis) is out today and Frank Karl is trying to see whether he can do the analysis or they have to wait for Matt to come back tomorrow.
Richard Meier was moving his cables. I also saw that a carpenter was installing the railing for the platform (all in Aluminium) in the Lead-End. So, the schedule that D. Phillips sent last Friday (below) seems to be materializing (though Dave is not here today). Hopefully, the riggers and Ray Ceruti’s group can install the Extension this Wed.
Kin
From: Phillips, David B
sPHENIX Magnet plan for next week:
Friday 7/7 – Riggers place cryostat in correct position Friday 7/7-Monday 7/10 – Survey confirms cryostat is correctly positioned Monday 7/10-Tuesday 7/11 – Carpenters install handrails and access ladder to internal Lead End platform. Wednesday 7/12 – Riggers and Magnet Division install Valve Box Extension Monday 7/10 - until completed – Drilling/taping holes in return steel Thursday 7/13 – until completed - Riggers install return steel (this needs to be coordinated with MD Teck’s working on Dog House connections)
Week of 7/17: - MD Teck’s continue with Dog House connections - Riggers install Return Steel and shield blocks for Valve Box Platform - Carpenters assemble scaffolding for access to External Dog House - Carpenters install handrails etc for Valve Box Platform
David Phillips Building 911B Upton, NY 11973 631-344-4671, Fax 631-344-5954, Cell 631-804-9477 On site pager 344-3456 then 4267 then your number
|
-
[Sphenix-magnet-l] Sonny and Joe have taken the half-rack ... waiting for the survey result ... carpenter putting up the railing,
Yip, Kin, 07/10/2017
-
Message not available
-
[Sphenix-magnet-l] Is it OK to stand inside the solenoid ?,
Yip, Kin, 07/10/2017
-
Re: [Sphenix-magnet-l] Is it OK to stand inside the solenoid ?,
John Haggerty, 07/10/2017
-
Re: [Sphenix-magnet-l] Is it OK to stand inside the solenoid ?,
Anerella, Michael D, 07/10/2017
-
Re: [Sphenix-magnet-l] Is it OK to stand inside the solenoid ?,
Kin Yip, 07/10/2017
-
Re: [Sphenix-magnet-l] Is it OK to stand inside the solenoid ?,
EdwardOBrien, 07/10/2017
- Re: [Sphenix-magnet-l] Is it OK to stand inside the solenoid ?, Than, Yatming (Roberto), 07/10/2017
- Re: [Sphenix-magnet-l] Is it OK to stand inside the solenoid ?, EdwardOBrien, 07/10/2017
- Re: [Sphenix-magnet-l] Is it OK to stand inside the solenoid ?, Kin Yip, 07/10/2017
- Re: [Sphenix-magnet-l] Is it OK to stand inside the solenoid ?, Than, Yatming (Roberto), 07/10/2017
- Re: [Sphenix-magnet-l] Is it OK to stand inside the solenoid ?, Yip, Kin, 07/11/2017
-
Re: [Sphenix-magnet-l] Is it OK to stand inside the solenoid ?,
EdwardOBrien, 07/10/2017
-
Re: [Sphenix-magnet-l] Is it OK to stand inside the solenoid ?,
Kin Yip, 07/10/2017
-
Re: [Sphenix-magnet-l] Is it OK to stand inside the solenoid ?,
Anerella, Michael D, 07/10/2017
-
Re: [Sphenix-magnet-l] Is it OK to stand inside the solenoid ?,
John Haggerty, 07/10/2017
-
[Sphenix-magnet-l] Is it OK to stand inside the solenoid ?,
Yip, Kin, 07/10/2017
-
Message not available
Archive powered by MHonArc 2.6.24.