sphenix-magnet-l AT lists.bnl.gov
Subject: sPHENIX discussion of the superconducting solenoid
List archive
- [Sphenix-magnet-l] Reminder for today's (hopefully) short sPHENIX-Magnet biweekly meeting (Aug. 2, 2017) at 1:30 pm in the 902 conf. room, Yip, Kin, 08/02/2017
- [Sphenix-magnet-l] Brief Summary of the sPHENIX Magnet biweekly meeting (Aug. 2, 2017) at 1:30 pm at the 902 conf. room, Yip, Kin, 08/02/2017
- [Sphenix-magnet-l] PSI ramping, Kin Yip, 08/04/2017
- [Sphenix-magnet-l] the old connection document for J6 signals (TS32/TS92, TT04/TT05), Kin Yip, 08/07/2017
- [Sphenix-magnet-l] closing the heat shield on the Magnet/Extension junction ... no more chance to make connection at the Magnet/Extension junction !, Kin Yip, 08/08/2017
-
[Sphenix-magnet-l] Photos inside the junction box at the Magnet/Extension ... Ray is going to wrap up/shield this junction box,
Yip, Kin, 08/09/2017
- <Possible follow-up(s)>
- Re: [Sphenix-magnet-l] Photos inside the junction box at the Magnet/Extension ... Ray is going to wrap up/shield this junction box, Yip, Kin, 08/09/2017
- [Sphenix-magnet-l] Fwd: 0.5A/s ramps ... schedule, Kin Yip, 08/11/2017
- [Sphenix-magnet-l] Only two doors were left open at the junction box (Magnet/Extension), Kin Yip, 08/11/2017
- [Sphenix-magnet-l] electrical test/hipot done ... ready for Ray to close the doors for the doghouse (Magnet/Extension), Yip, Kin, 08/14/2017
- [Sphenix-magnet-l] Fw: Doors are installed, Yip, Kin, 08/15/2017
- [Sphenix-magnet-l] Reminder for today's sPHENIX-Magnet biweekly meeting (Aug. 16, 2017) at 1:30 pm in the 902 conf. room, Yip, Kin, 08/16/2017
- [Sphenix-magnet-l] Brief Summary of the sPHENIX Magnet biweekly meeting (Aug. 16, 2017) at 1:30 pm at the 902 conf. room, Yip, Kin, 08/16/2017
- [Sphenix-magnet-l] Power Supply in place ... it's luck that it's moved away from the 912 highbay area as it's flooded now, Yip, Kin, 08/18/2017
- [Sphenix-magnet-l] End-walls are installed before the eclipse ..., Yip, Kin, 08/21/2017
- [Sphenix-magnet-l] Still building the concrete platform, Kin Yip, 08/25/2017
- [Sphenix-magnet-l] Brief Summary of today's shortest meeting (Aug. 30, 2017) at Bldg. 902 conf. room, Yip, Kin, 08/30/2017
- [Sphenix-magnet-l] Valvebox Platform installed ! ... staircases ..., Yip, Kin, 08/31/2017
Archive powered by MHonArc 2.6.24.