[Sphenix-magnet-l] Brief Summary of the sPHENIX Magnet biweekly meeting (Aug. 2, 2017) at 1:30 pm at the 902 conf. room
- From: "Yip, Kin" <kinyip AT bnl.gov>
- To: "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>
- Subject: [Sphenix-magnet-l] Brief Summary of the sPHENIX Magnet biweekly meeting (Aug. 2, 2017) at 1:30 pm at the 902 conf. room
- Date: Wed, 2 Aug 2017 20:39:26 +0000
Agenda/powerpoint : https://indico.bnl.gov/conferenceDisplay.py?confId=3398
1. D. Phillips explains his new layout (https://indico.bnl.gov/getFile.py/access?sessionId=0&resId=0&materialId=0&confId=3398) as he’s moved the staircase platform to the Lead-End side of the Magnet.
and we may even need to wait as late as the next Monday (Aug. 28) to assembly the staircase. 2. Ray Ceruti discussed with us about what needs to be done. Only after J. Dambra finished making the electrical connection, can Ray install the heat shield etc. Ray told us that though the heat shield looks beautiful on the table, they’re difficult to work with. It’ll take
3.
The Cryo needs to connect the un-connected Cryo connectors at the Magnet/Extension junction before Ray can close the heat shield. 4. Pablo Rosas has not finished the PSI ramping test. He’s met some hardware and software interface problem. R. Schoenfeld and J. Jamilkowski are/have been helping Pablo.
5.
We also discussed when we may put up the roof-steel and end-walls and the magnetic field measurement equipment inside the Coil.
Kin |