  • From: Kin Yip <kinyip AT bnl.gov>
  • To: "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>
  • Subject: [Sphenix-magnet-l] Survey Group's Cryostat positions
  • Date: Wed, 13 Sep 2017 09:53:51 -0400

Hi,

Attached is the survey group's (Matt Ilardo's) report on the difference of the Control Target positions on the Cryostat,
comparing the positions when the Cryostat was still down in the yellow frame (before being moved to the Steel Box)
and now.

It's possible that it may have something to with our changing the tie-rod operation from the "transportation" mode to
the "operation mode" (nominal).

You may probably want to read the differences in 8 control positions, rather than the max./min. as they are just max. or min.
for each individual columns (dX, dY, dZ and dMag) and dMag != sqrt(dX^2 + dY^2 + dZ^2) in the top table but
dMag = sqrt(dX^2 + dY^2 + dZ^2) in the table below :-)

Kin

-------- Forwarded Message -------- Date: Wed, 13 Sep 2017 09:02:33 -0400 From: Ilardo, Matthew <milardo AT bnl.gov> To: Yip, Kin <kinyip AT bnl.gov>, Phillips, David B <phillips AT bnl.gov>

KIN,

 

                HERE IS THE REPORT.

Attachment: Groups MAGNET CONTROL to NEW CONTROL CHECK-MM.pdf
Description: Adobe PDF document