Kin,

Thanks for all your efforts to push this test along, there's still a lot to do to cross the finish line, but it's definitely getting there.

Two things I'm wondering about going into the long weekend that we don't want to fall through the cracks are:

- cooling water to the power supply (and quench resistor?)
- rigging the roof back onto the flux return

Do you think we're ok with those things, or is there anything else that might need us to seek more help?

On 10/6/17 10:33 AM, Kin Yip wrote:
Hello Ray,

Sorry to have disappointed you last time :-( :-)     The carpenters are putting up the handrails today and then the plywood platform.
By chatting with them and Dave Phillips's experience, they probably need another day next week to finish.  Next Monday is
holiday.  On Tue., our carpenters are scheduled to do non-sPHENIX things and they return to finish sPHENIX work on Wed.

Riggers are scheduled to work for sPHENIX Magnet the entire next week anyway, either on installing the steel or the Valvebox.

Do you think you guys have time next Thursday (Oct. 12, 2017) to install Valvebox (together with the riggers) ??

Kin


_______________________________________________
sPHENIX-magnet-l mailing list
sPHENIX-magnet-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/sphenix-magnet-l



--
John Haggerty
email: haggerty AT bnl.gov
cell: 631 741 3358




Archive powered by MHonArc 2.6.24.

Top of Page