sphenix-magnet-l AT lists.bnl.gov
Subject: sPHENIX discussion of the superconducting solenoid
List archive
Re: [Sphenix-magnet-l] Brief Summary of sPHENIX Magnet Biweekly Meeting (Oct. 25, 2017) at 902A Conf. Room
- From: "Yip, Kin" <kinyip AT bnl.gov>
- To: "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>
- Cc: "Eisele, William" <weisele AT bnl.gov>, "Kulmatycski, Kyle" <kkulmatycski AT bnl.gov>
- Subject: Re: [Sphenix-magnet-l] Brief Summary of sPHENIX Magnet Biweekly Meeting (Oct. 25, 2017) at 902A Conf. Room
- Date: Wed, 25 Oct 2017 20:26:40 +0000
Sorry that I haven’t finished point 7 before I accidentally hit a wrong button. So, let me finish pt. 7 :
7.
For the External Review on the Cryo system (tapping into RHIC), I showed the charge again in the meeting which is :
From: sPHENIX-magnet-l [mailto:sphenix-magnet-l-bounces AT lists.bnl.gov]
On Behalf Of Yip, Kin
Agenda/powerpoint: https://indico.bnl.gov/conferenceDisplay.py?confId=3774
1.
Ray Ceruti told us that he’s going to trying to do the leak check with the help of Steve Gills (C-AD vacuum group). He’s hoping that it’ll be done this week.
2.
Ray also told us that he doesn’t need to go into the Magnet (from the Non-Lead End) any more. So, Jon Hock can try to close the roof steel. Whenever he
3.
Carl Schultheiss and Zeynep Altinbas with the help of technicians (Fred, Ralph, ….) are doing the test. [ Actually we had another meeting at 3 pm after this Magnet meeting
4.
Paul Orfin told us that he still thinks they may be able to finish the all the Cryo assembly ~3 weeks from now. So, with all the above, we collectively
5. Paul Orfin asked that we should try to get a power outlet as soon as possible for them at the top platform. Paul Giannotti will talk to Mike Rau. Talking with PK, he told me that this would happen soon anyway (as it’s at the last stage…). 6. Paul Orfin and Roberto Than told us that they still haven’t fixed the capacity problem of their plant. They’re a few things and will test it again in a couple weeks and hopefully the problem will be resolved then.
7. For the External Review on the Cryo system (tapping into RHIC), I showed the charge again which is :
|
-
[Sphenix-magnet-l] Brief Summary of sPHENIX Magnet Biweekly Meeting (Oct. 25, 2017) at 902A Conf. Room,
Yip, Kin, 10/25/2017
- Re: [Sphenix-magnet-l] Brief Summary of sPHENIX Magnet Biweekly Meeting (Oct. 25, 2017) at 902A Conf. Room, Yip, Kin, 10/25/2017
Archive powered by MHonArc 2.6.24.