Skip to Content.
Sympa Menu

sphenix-magnet-l - [Sphenix-magnet-l] Magnet area is ready for repairs/testing.

sphenix-magnet-l AT lists.bnl.gov

Subject: sPHENIX discussion of the superconducting solenoid

List archive

Chronological Thread  
  • From: "Phillips, David B" <phillips AT bnl.gov>
  • To: "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>
  • Cc: "Folz, Charles" <cfolz AT bnl.gov>, "Christie, William" <christie AT bnl.gov>
  • Subject: [Sphenix-magnet-l] Magnet area is ready for repairs/testing.
  • Date: Thu, 14 Feb 2019 16:38:50 +0000

The full field test area is ready for the planned repairs and testing.

 

After these repairs and testing are complete, the plan is to move the cryostat (with extension & new doghouse) into the shipping frame.

Then the return steel will be completely disassembled, we would like to complete this before the end of this RHIC run (this is driven by the efficient use of rigging and tech resources).

At this time the plan is to store the cryostat and valvebox in EEBA (the building where they are now) until the move for installation in 1008.

 

David Phillips

Building 911B

Upton, NY 11973

631-344-4671, Fax 631-344-5954, Cell 631-804-9477

 



  • [Sphenix-magnet-l] Magnet area is ready for repairs/testing., Phillips, David B, 02/14/2019

Archive powered by MHonArc 2.6.24.

Top of Page