sphenix-magnet-l AT lists.bnl.gov
Subject: sPHENIX discussion of the superconducting solenoid
List archive
Re: [Sphenix-magnet-l] Brieif Summary of today's Magnet meeting (Mar. 27, 2019) at 902A conference room
- From: "Yip, Kin" <kinyip AT bnl.gov>
- To: "Phillips, David B" <phillips AT bnl.gov>, "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>
- Subject: Re: [Sphenix-magnet-l] Brieif Summary of today's Magnet meeting (Mar. 27, 2019) at 902A conference room
- Date: Thu, 28 Mar 2019 19:24:03 +0000
Hi, Thanks for all the works so far. But I like your choices ! > If we want the option to add a resistor (to reduce ramp down time) we should have a plan and leave space for it now. This sounds good. I guess Carl may be happy about this, too. With the same parameters ( L=2.33 etc. ), let me show the ramp-down time (from 4600 A) to 1000 A or 1300 A. From \\bnl.gov\c-adnas\babar\BaBar P.S. Manual\Babar P.S. Section1.pdf, p.15 (PDF page), in their ramp-down example, they did fast discharge at 1338 A. { A note there said "500 A to 2000 A" is acceptable. } Fast discharge at 1300 A would save a few to several minutes compared to 1000 A. ( I imagine we could do that after some experience of stability. ) Total-Resistance (mOhm) ramp-down time to 1000/1300 A di/dt at time=0 (A/s) 0.73 3329/2874 -1.74 0.86 2963/2548 -2.00 0.92 2819/2421 -2.12 The delay (once in a while ?) is not comparable to the risk of having a high risk quench. I like the choice of 0.73 mOhm very much :-) By the way, you can try to verify those calculations from my webpage: https://www.c-ad.bnl.gov/kinyip/sPHENIX_Ramp_Down.html { I know it's not as appealing as facebook.com :-) But my website doesn't have any advertisement and it can't dig out your personal information and track your location etc. ... At least not as harmful :-) } Kin On 3/28/19 1:39 PM, Phillips, David B wrote:
|
-
[Sphenix-magnet-l] Brieif Summary of today's Magnet meeting (Mar. 27, 2019) at 902A conference room,
Yip, Kin, 03/27/2019
-
Re: [Sphenix-magnet-l] Brieif Summary of today's Magnet meeting (Mar. 27, 2019) at 902A conference room,
Phillips, David B, 03/28/2019
- Re: [Sphenix-magnet-l] Brieif Summary of today's Magnet meeting (Mar. 27, 2019) at 902A conference room, Yip, Kin, 03/28/2019
-
Re: [Sphenix-magnet-l] Brieif Summary of today's Magnet meeting (Mar. 27, 2019) at 902A conference room,
Phillips, David B, 03/28/2019
Archive powered by MHonArc 2.6.24.