sphenix-magnet-l AT lists.bnl.gov
Subject: sPHENIX discussion of the superconducting solenoid
List archive
[Sphenix-magnet-l] work order (shipping brace) sent ... Joe D'Ambra going to work with us for the Voltage Tap on Monday (9:30 am)
- From: "Yip, Kin" <kinyip AT bnl.gov>
- To: "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>
- Cc: "Dambra, Joseph A" <joeda AT bnl.gov>
- Subject: [Sphenix-magnet-l] work order (shipping brace) sent ... Joe D'Ambra going to work with us for the Voltage Tap on Monday (9:30 am)
- Date: Fri, 7 Jun 2019 14:38:17 +0000
Hello, After about 2 week's' review (by D. Phillips, J. Mills, R. Than et. al.), Paul has sent out the work order (EP1086071) for the Valvebox Extension shipping brace (as shown in the pictures in the last email) to be done by the Shop (@BNL). The estimate is : =========================================== The total estimate is as follows: Materials: 550.00 Labor: 3,916.50 Total Cost: 4,466.46 Estimator: Holland, Robert A (631/344-2371) ===========================================
***************** ***************** *****************
On another front, Joe D'Ambra et. al. from Superconducting Magnet Division, will start working on the voltage taps
in the doghouse(s) in 912, on June 10th (next Monday). They'll meet at 9:30 am in Carl Schultheiss office.
On 5/20/19 2:38 PM, Kin Yip wrote:
Hi, |
- [Sphenix-magnet-l] work order (shipping brace) sent ... Joe D'Ambra going to work with us for the Voltage Tap on Monday (9:30 am), Yip, Kin, 06/07/2019
Archive powered by MHonArc 2.6.24.