- Date: Wed, 27 Jan 2021 13:07:17 +0000
This is perfect, thanks Ray. The rigging and carpentry is scheduled for tomorrow, but may start as early as late this morning. I’ll keep in touch with them and notify Paul once complete. thanks Brian
From: Yip, Kin <kinyip AT bnl.gov>
Thanks a lot, Ray !
Kin
-------- Original message -------- From: "Ceruti, Raymond B" <rayc AT bnl.gov> Date: 1/27/21 08:01 (GMT-05:00) To: "Streckenbach, Brian" <bstreckenbach AT bnl.gov>, "Yip, Kin" <kinyip AT bnl.gov>, "Orfin, Paul" <porfin AT bnl.gov> Cc: "Korol, Alex J" <korola AT bnl.gov>, "Kobasiuk, Frederick D" <kobasiuk AT bnl.gov>, sphenix-magnet-l AT lists.bnl.gov, "Ceruti, Raymond B" <rayc AT bnl.gov>, "Anerella, Michael D" <mda AT bnl.gov> Subject: FW: A&B
Good Morning All,
As per Brian Streckenbach I’ve moved the two valve box doors, related parts / hardware off the scaffold and placed underneath the valve box. Each side is labeled and should be out of the way to accommodate the repositioning of the new scaffold.
Regards, Ray
|
-
[Sphenix-magnet-l] FW: A&B,
Ceruti, Raymond B, 01/27/2021
-
Re: [Sphenix-magnet-l] A&B,
Yip, Kin, 01/27/2021
- Re: [Sphenix-magnet-l] A&B, Streckenbach, Brian, 01/27/2021
-
Re: [Sphenix-magnet-l] A&B,
Yip, Kin, 01/27/2021
Archive powered by MHonArc 2.6.24.