Hello,
Attached is the report from the Apr. 7-8, 2021 I&F Review. For our Magnet,
there are two direct recommendations:
(1) The risk of losing additional voltage taps in inaccessible areas, while
admittedly unlikely,
should be kept in mind and the I&F team should evaluate how to monitor the
health of
the main superconducting coil if any other voltage taps, temperature, or
strain sensors
fail. Also, before hooking up the magnet power, the team should hipot the
warm supply
cables and dump resistor system.
(2) Since any delay in performing magnetic field measurements directly
impacts the timeline
for other activities, the team should flesh out the backup plan for training
BNL staff to
use the CERN measurement system in a report submitted to NPP management.
For (1), those are the things that we're going to do anyway. ( Carl, please
do mention in the May ESRC review that you'll hipot dump resistor and power
supply cables etc. ... to show that we're "safe". )
For (2), John and I talked about it a week ago and John has promised to write
such a "backup" plan. ( If necessary, I've talked with Piyush and they in
SMD could help. ) John is thinking that we
can set up the DAQ system such that CERN guys can remotely do the mapping 😊
This way, just a person or two in 1008 need to stay there to watch 😊 We are
going and have prepared/made progress to
provide the rail/support inside the Magnet for the CERN mapper to operate
(rotate and move) anyway.
Kin
-----Original Message-----
From: Edward O'Brien <eobrien AT bnl.gov>
Sent: Thursday, April 22, 2021 4:20 PM
To: O'Brien, Edward <eobrien AT bnl.gov>; Haggerty, John <haggerty AT bnl.gov>;
Mills, James A <mills AT bnl.gov>; Sourikova,Irina V <irina AT bnl.gov>; Pontieri,
Chris <cpontieri AT bnl.gov>; Glenn Young <glennyoung82251 AT gmail.com>; Feder,
Russell <rfeder AT bnl.gov>; Gutta, Rajendra Rao <rgutta AT bnl.gov>; Vasquez, Joel
<jvasquez AT bnl.gov>; Sourikova,Irina V <irina AT bnl.gov>; Thomas K Hemmick
<tkhemmick AT gmail.com>; Woody, Craig <woody AT bnl.gov>; lajoie, John G [PHYSA]
<lajoie AT iastate.edu>; Mannel, Eric <mannel AT bnl.gov>; Purschke, Martin
<purschke AT bnl.gov>; Chiu, Mickey <chiu AT bnl.gov>; Klaus Dehmelt
<klaus.dehmelt AT stonybrook.edu>; Senta Greene <senta.v.greene AT vanderbilt.edu>;
W J Llope <wjllope AT wayne.edu>; Sasha Milov <alexander.milov AT weizmann.ac.il>;
Sakaguchi, Takao <takao AT bnl.gov>; Huang, Jin <jhuang AT bnl.gov>; Pisani, Robert
<pisani AT bnl.gov>; Stoll, Sean <stoll AT bnl.gov>; Caroline Riedl
<criedl AT illinois.edu>; Megan Connors <meganEconnors AT gmail.com>; Pontieri,
Chris <cpontieri AT bnl.gov>; Bathe, Stefan <bathe AT bnl.gov>; Aidala, Christine
<caidala AT bnl.gov>; Boose, Stephen <boose AT bnl.gov>; Cheng-Yi Chi
<chi AT nevis.columbia.edu>; Gortakowski, Charles <cgortakowski AT bnl.gov>; Nagle,
James <Jamie.nagle AT colorado.edu>; Yip, Kin <kinyip AT bnl.gov>; Russell Feder
<russell.feder.me AT gmail.com>; Than, Yatming (Roberto) <ythan AT bnl.gov>;
Schultheiss, Carl <carls AT bnl.gov>; Anerella, Michael D <mda AT bnl.gov>; Mills,
James A <mills AT bnl.gov>; Vasquez, Joel <jvasquez AT bnl.gov>; Streckenbach,
Brian <bstreckenbach AT bnl.gov>; Stiegler, Lori <stiegler AT bnl.gov>; Orfin, Paul
<porfin AT bnl.gov>; Morrison, David <morrison AT bnl.gov>; Gunther M Roland
<rolandg AT mit.edu>
Cc: Haggerty, John <haggerty AT bnl.gov>; Morrison, David <morrison AT bnl.gov>;
Kistenev, Edouard <kistenev AT bnl.gov>; Woody, Craig <woody AT bnl.gov>; Glenn
Young <glennyoung82251 AT gmail.com>; Purschke, Martin <purschke AT bnl.gov>;
Pontieri, Chris <cpontieri AT bnl.gov>; Pinkenburg, Christopher
<pinkenbu AT bnl.gov>; Chiu, Mickey <chiu AT bnl.gov>; Nouicer, Rachid
<nouicer AT bnl.gov>; Sakaguchi, Takao <takao AT bnl.gov>; Huang, Jin
<jhuang AT bnl.gov>; Vasquez, Joel <jvasquez AT bnl.gov>; Dan Cacace
<dannycacace AT gmail.com>; Mills, James A <mills AT bnl.gov>; Boose, Stephen
<boose AT bnl.gov>; Azmoun, Babak <azmoun AT bnl.gov>; Pisani, Robert
<pisani AT bnl.gov>; Irina Sourikova <irina AT rcf.rhic.bnl.gov>; Feder, Russell
<rfeder AT bnl.gov>; Mannel, Eric <mannel AT bnl.gov>; Stoll, Sean <stoll AT bnl.gov>;
Ruggiero, Richard <ruggiero AT bnl.gov>; Biggs, John C <biggs AT bnl.gov>; La
Bounty, James <labounty AT bnl.gov>; Lenz, Michael D <mlenz AT bnl.gov>; Faulkner,
Mariette <faulkner AT bnl.gov>; Allen, Aron <allena AT bnl.gov>; Lenz, William
<wlenz AT bnl.gov>; Polizzo, Salvatore A <sapolizzo AT bnl.gov>; Toldo, Frank A
<fatoldo AT bnl.gov>; Borrelli, Alfonso <borrelli AT bnl.gov>; Hamblen, Peter
<phamblen AT bnl.gov>; Prifte, Shana <sprifte AT bnl.gov>; Cordovano, Christopher
<ccordovan AT bnl.gov>
Subject: Report for the 1008 I&F Upgrade review
Dear all,
The report from the 1008 I&F Upgrade review is attached.
Overall it is a very positive report as was the Close Out.
Though there are a number of recommendations, you'll see that
they are all constructive and in a number of cases
items that we have already begun working on. Congratulations
to all participants in the review including both the speakers
and those that provided us with the information and documentation
that we presented to the committee. The committee was impressed by
what we have accomplished and optimistic that our project will
be brought to a successful conclusion, as we should all be.
Thanks for the great job everybody.
Ed
Attachment:
Report_Infrastructure and Facility Upgrade Review_April 2021-1.pdf
Description: Report_Infrastructure and Facility Upgrade Review_April 2021-1.pdf
- [Sphenix-magnet-l] FW: Report for the 1008 I&F Upgrade review, Yip, Kin, 04/22/2021
Archive powered by MHonArc 2.6.24.