- [Sphenix-magnet-l] (no subject), Yip, Kin, 09/07/2021
- [Sphenix-magnet-l] Computer in 1008B set up, Yip, Kin, 09/07/2021
- [Sphenix-magnet-l] Only the last sector of Hadron Calorimeter remains to be installed before Magnet may be installed .... our sPHENIX Liaison Engineer is leaving, Yip, Kin, 09/08/2021
- [Sphenix-magnet-l] FW: Pictures (magnet support on HCAL ... before the transport), Yip, Kin, 09/14/2021
- [Sphenix-magnet-l] FW: dates from Russ, Yip, Kin, 09/14/2021
- [Sphenix-magnet-l] a preliminary walkthrough by LESHC PCSS ... the coldbox in 1008B ... Joel's interface box, Yip, Kin, 09/22/2021
- [Sphenix-magnet-l] What Joe Tuozzolo wrote after the PCSS walkthrough, Yip, Kin, 09/24/2021
- [Sphenix-magnet-l] Magnet is scheduled to move to 1008 by the end of this week if the critical lifting form is approved, Yip, Kin, 09/27/2021
- [Sphenix-magnet-l] sPHENIX and sPHENIX Magnet interface, Yip, Kin, 09/28/2021
-
[Sphenix-magnet-l] Magnet was just moved to the 912 door ... ready for transport tomorrow to 1008,
Yip, Kin, 09/29/2021
- Message not available
- Re: [Sphenix-magnet-l] Magnet was just moved to the 912 door ... ready for transport tomorrow to 1008, Sondheim, Walter E, 09/29/2021
- Re: [Sphenix-magnet-l] Magnet has arrived in 1008, Sondheim, Walter E, 09/30/2021