Hi,

 

Thanks, Russ.  I just send this to our mail archive and share with my colleagues.

 

Kin

 

From: Feder, Russell <rfeder AT bnl.gov>
Sent: Tuesday, September 14, 2021 2:36 PM
To: Yip, Kin <kinyip AT bnl.gov>; Mills, James A <mills AT bnl.gov>; Pontieri, Chris <cpontieri AT bnl.gov>
Cc: Orfin, Paul <porfin AT bnl.gov>; Glenn Young (glennyoung82251 AT gmail.com) <glennyoung82251 AT gmail.com>
Subject: Re: dates from Russ

 

Kin

These are in P6 spread around and with some adjustments from me for it all to hang together...

 

Russell Feder

Brookhaven National Lab

sPHENIX Chief Mechanical Engineer

631-655-2491

 


From: Yip, Kin <kinyip AT bnl.gov>
Sent: Tuesday, September 14, 2021 2:35 PM
To: Feder, Russell <rfeder AT bnl.gov>; Mills, James A <mills AT bnl.gov>; Pontieri, Chris <cpontieri AT bnl.gov>
Cc: Orfin, Paul <porfin AT bnl.gov>
Subject: dates from Russ

 

Hi Russ,

 

Thanks a lot.   These are the dates in your “plan”,  not really in the official P6 (that Irina and Glenn discuss with us every month) , right ?   Or are they ??

 

Kin

 

From: Feder, Russell <rfeder AT bnl.gov>
Sent: Tuesday, September 14, 2021 2:32 PM
To: Yip, Kin <kinyip AT bnl.gov>; Mills, James A <mills AT bnl.gov>; Pontieri, Chris <cpontieri AT bnl.gov>
Subject: Re: [Sphenix-magnet-l] FW: Pictures (magnet support on HCAL ... before the transport)

 

  1. The move of the solenoid into the 1008 assembly hall --> landing magnet and any AH testing of magnet done by 11/8/21, we will land magnet probably by late next week.
  2. The move of the existing solenoid valve box into the 1008 assembly hall --> 3/28/22
  3. The completion of the platform in the 1008 assembly hall so that we can begin to install the remaining cryogenic lines. --> no later than 3/28/22 to accept valve box

4.       Roll in of the platform into the IP8 hall. --> around 4/6/22

 

 

Russell Feder

Brookhaven National Lab

sPHENIX Chief Mechanical Engineer

631-655-2491

 


From: Yip, Kin <kinyip AT bnl.gov>
Sent: Tuesday, September 14, 2021 2:27 PM
To: Feder, Russell <rfeder AT bnl.gov>; Mills, James A <mills AT bnl.gov>; Pontieri, Chris <cpontieri AT bnl.gov>
Subject: FW: [Sphenix-magnet-l] FW: Pictures (magnet support on HCAL ... before the transport)

 

Hi,

 

In the P6, do you guys have a date for any of the following items that Paul is interested in ??

 

  1. The move of the solenoid into the 1008 assembly hall
  2. The move of the existing solenoid valve box into the 1008 assembly hall
  3. The completion of the platform in the 1008 assembly hall so that we can begin to install the remaining cryogenic lines.

4.       Roll in of the platform into the IP8 hall.

 

There isn’t one in the Magnet section.  I wonder whether there is such a date in your part of the P6 ??

 

Can you please advise ??

 

Kin

 

From: Yip, Kin
Sent: Tuesday, September 14, 2021 2:25 PM
To: Orfin, Paul <porfin AT bnl.gov>
Cc: Glenn Young <glennyoung82251 AT gmail.com>
Subject: RE: [Sphenix-magnet-l] FW: Pictures (magnet support on HCAL ... before the transport)

 

Hi Paul and Glenn,

 

To the best of my ability, I can only find the following two items which may be vaguely relevant to Paul.

 

281400   Magnet and Solenoid Valvebox – Reinstall                                                          Feb. 8, 2022 to Mar. 15, 2022.

281600   Magnet - Solenoid Valvebox - Complete, Ready for Cryo Connections          Mar. 29, 2022

 

I’m not sure P6 has an item for each of Paul’s 4 points.    I don’t have any of those spreadsheets/details related to infrastructure and installation.

 

Glenn, can you please advise ???

 

Kin

 

From: Orfin, Paul <porfin AT bnl.gov>
Sent: Tuesday, September 14, 2021 12:32 PM
To: Yip, Kin <kinyip AT bnl.gov>
Subject: RE: [Sphenix-magnet-l] FW: Pictures (magnet support on HCAL ... before the transport)

 

Kin,

 

I am looking to get dates for the following project events.

 

1.       The move of the solenoid into the 1008 assembly hall

2.       The move of the existing solenoid valve box into the 1008 assembly hall

3.       The completion of the platform in the 1008 assembly hall so that we can begin to install the remaining cryogenic lines.

4.       Roll in of the platform into the IP8 hall.

 

Thank you,

Paul Orfin
Cryogenic Systems, Collider-Accelerator Department
Brookhaven National Laboratory
Telephone: (631) 344-2899

 



  • [Sphenix-magnet-l] FW: dates from Russ, Yip, Kin, 09/14/2021

Archive powered by MHonArc 2.6.24.

Top of Page